Back fill material will be varied. So far it's been gravel (sand, stones and pebbles). There is a drainage plan that calls for a layer of crushed rock which leads water to the drain pipes in the ring wall. Finish material would be sand and (if there's $) loam soil for planting grass. The area just south of the TT will be a grassy area where people can watch the locomotives being turned.