Hi Dwight, looking at the photos showing the shift of Track 7 so that it lines up with the turntable, it looks like the edge of some of the ties (that Jeff shifted westward) are close to the edge of the embankment. I like the drain pipes to channel the shop roof run-off into the ditch; I'm sure it will help keep the ground drier.
I also noticed the nice drain pipe under the future roundhouse leads, up towards the Percival house. The culvert pipe ends in a smallish opening, just right for someone to fall into; will the pipe be extended under the driveway, or will there be a grating or protective fence around the opening?
Good luck next week with the convention attendees!
Dave Crow