October 2025 work reports
« on: October 01, 2025, 05:35:21 AM »
Anticipated work for Saturday Oct 4:

* First day of Pumpkin trains, with two trainsets running.  All hands needed.
* Coal storage: Mike will be placing the blocks as the walls of the coal bin.
* Engine house tweaks
* Archives

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,452
  • Loco for 6
    • View Profile
Re: October 2025 work reports
« Reply #1 on: October 04, 2025, 04:10:24 PM »
Work done  on Saturday Oct 4:

* Coal storage bin: Mike picked up the blocks (with the forklift), and Brian W, Bryce and myself helped spot them.  The bin is ready for coal (except maybe the concrete surface has to cure for a little more time).  We had a coal delivery this past week.
* Engine house: Stewart was puttering around in it.
* Pumpkin trains: One trainset, but only going to Top of Mountain.  Loco swap at Sheepscot, between 9 and 52.  Sold out trains.
* Archives: The Archives Committee had a meeting.

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,878
    • View Profile
Re: October 2025 work reports
« Reply #2 on: October 04, 2025, 05:42:12 PM »




Mike
Doing way too much to list...

Jeff Schumaker

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,419
    • View Profile
Re: October 2025 work reports
« Reply #3 on: October 05, 2025, 07:58:03 AM »
Looks good, Mike. Is that Bryce or Dan in the 1st photo?

Jeff
Hey Rocky, watch me pull a moose trout out of my hat.

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,878
    • View Profile
Re: October 2025 work reports
« Reply #4 on: October 05, 2025, 12:12:17 PM »
Bryce in orange talking with Brian
Mike
Doing way too much to list...

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,452
  • Loco for 6
    • View Profile
Re: October 2025 work reports
« Reply #5 on: October 08, 2025, 05:41:52 AM »
Anticipated work for Thursday - Monday October 9 - 13 - Fall Work Weekend

* Track replacement at Humason Brook - this is a critical piece, grading of it is today, track replacement starts Thursday and MUST be done by Sunday evening.
* Pumpkin trains - on Monday (which is why the track must be done on Sunday)
* Carpentry work - perhaps residing the rest of Alna Center
* Archives - a clean-out on Saturday (not sure what Linda has in mind, but she needs help)
* Board meeting - Saturday at 9 AM, location still TBD
* Food - Nancy and crew
* and probably a number of other projects that I've forgotten.

Emmett Reis

  • Engine Wiper
  • Posts: 9
    • View Profile
Re: October 2025 work reports
« Reply #6 on: October 10, 2025, 11:36:26 AM »
Are there any changes of plan for Mondays trains since there's a 70% chance of rain that day?

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,452
  • Loco for 6
    • View Profile
Re: October 2025 work reports
« Reply #7 on: October 11, 2025, 05:29:22 PM »
Work done Saturday (and from the week preceding) Oct 11:

* Track - Monday there was a charter.  Tuesday the track was removed south of Humason Brook.  Wednesday/Thursday the roadbed was regraded.  Friday the track was relaid.  Saturday the track was spiked, ballasted, lined, and some lifting.
* Basement - Friday Linda started removing some items from the basement west wall.  Saturday this continued, then a new shelf was assembled and put into place, some other items were moved around, and then some items started to come back in.  A bunch of stuff was kicked out (hopefully) never to return.  Some of these have found new homes - some filing cabinets, some antique tools, etc.  The west side of the basement is now very organized.
* Coach 8 - Friday Eric S and crew put on a coat of varnish.  Saturday he and his crew put on a second coat of varnish.
* Loco 11 - Friday the crew put the eccentrics on the drivers.  They probably did more than that, but I didn't catch any of that.
* Machine shop/Vacuum brake bench/electrical - Friday many of the objects occupying the east wall of the shop extension were moved out from the wall, and Josh did some electrical work.  Saturday Stewart put in insulation and a wall panel on a section that never got it, and other work was done in that area too.  The east wall is getting a vacuum brake workbench soon.
* Food - Nancy and her crew were busy making 3 squares each day for folks.
* Coal - Mike spent the day moving coal from the dump pile to the new coal bin. 
* Board meeting - We met at 9 AM on the Sheepscot Platform for an abbreviated, 19-minute meeting.

There may have been other projects going on that I didn't catch.
« Last Edit: October 11, 2025, 07:12:51 PM by James Patten »

Bruce Wilson

  • Museum Member
  • Brakeman
  • ***
  • Posts: 192
    • View Profile
Re: October 2025 work reports
« Reply #8 on: October 11, 2025, 05:51:25 PM »
Great job reporting James. Very much appreciate the news and views of "the Alna Observer".
Wanted: Copies of correspondence and photographs from "first generation narrow gage railfans" such as Linwood Moody, Dick Andrews, Lawrence Brown, Ellis Atwood, H.T. Crittenden and others. Interested in all two foot (U.S.) rail operations, common carrier, industrial/mill and park/museum.

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,878
    • View Profile
Re: October 2025 work reports
« Reply #9 on: October 11, 2025, 08:08:15 PM »
I have added photos of various projects to the work and events pages..
Mike
Doing way too much to list...

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,452
  • Loco for 6
    • View Profile
Re: October 2025 work reports
« Reply #10 on: October 15, 2025, 05:38:49 AM »
Anticipated work for Saturday October 18:

* Pumpkin Trains to SeaLyon Farm.
* Engine house organizing
* Grounds
* Archives

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,452
  • Loco for 6
    • View Profile
Re: October 2025 work reports
« Reply #11 on: October 18, 2025, 04:23:15 PM »
Work done on Saturday Oct 18:

* Pumpkin trains - well attended.
* Basement - Linda and I assembled two shelving units, and filled one with food prep stuff, and the other with spare archival stuff (picture frames, etc).  Then I helped her order supplies for the Archives, and reinvigorated an old laptop for archives use.
* Shop - Tours were being given, and Bryce was working on something for 52.
* Engine house - Stewart was in there working, but I don't know on what.

Stephen Piwowarski

  • Museum Member
  • Conductor
  • *****
  • Posts: 806
    • View Profile
Re: October 2025 work reports
« Reply #12 on: October 18, 2025, 04:47:32 PM »
West side of the Alna Center roof is now half done. One more day should finish it!

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,878
    • View Profile
Re: October 2025 work reports
« Reply #13 on: October 18, 2025, 05:11:12 PM »
Another ttactor bucket of coal was removed from the old pile, loaded into 9. A new hydraulic hose was installed on ghe big dozer
Mike
Doing way too much to list...

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,452
  • Loco for 6
    • View Profile
Re: October 2025 work reports
« Reply #14 on: October 22, 2025, 05:37:59 AM »
Anticipated work for Saturday Oct 25:

* Last day of Pumpkin trains.
* Engine house tweaking
* Grounds work
* Archives
* Basement shelving assembly and cleanup