Completed work Tuesday 25 and Wednesday 26 August 2020
Tuesday:
* Flat car unloaded, selection of various switch parts loaded.
* Number #3 lead to car barn lifted and hand tamped. (Joe F, Steve L, Mark, Chuck)
* Coach #3, plumbing and vacuum brakes. (Johnathan)
* Mowing SS campus (Fred) Mowing with 2 mowers AC (Fred and Randy)
* Coach #9 assembly (Eric and Ron)
* Archives work on going. (Linda)
* Gift shop mail orders. (Cindy)
* Trash pick up and Dump run. (Stewart)
Wednesday:
* Switching, Caboose #320 returned to car barn. (Mark, Steve L, Chuck)
* Coach #3, plumbing and vacuum brakes. (Jonathan)
* TOM, Tamper parts removed for repairs. (Steve L, Mark, Chuck, Fred)
* Small engine repairs. (Jay)
* Crew takes hand car with ties and tools and replaces 5 ties. (Dan, Brian)
* Locomotive #9 repairs. (Roger)
* Archives, grounds up keep. (Linda)
* Rail joints, 32 bolts tighten. (Mark, Steve L)
* Gift shop mail orders to include one order going over seas. (Cindy)