This guy and I were at it again today..see him behind the pick-up cutting for me.

As nice as the day looked, it was cold. But we cut all the filler blocks that went between the south rafter ends. Look high. Barely noticable. To the left of the staging.

We then installed the Azec. Front first, then continued down the south side.

We also installed the metal drip edge, and this side is now ready for steel.


Next Saturday we will do the North side. Fred says I am too fussy because I take my time and check things often on the trim, but I think it looks good and am happy the way it turned out.