Work done on Saturday October 15:
* Top of Mountain: Mike did more grading work, then loaded the bulldozer on the flatcar (brought up on the 2:30 train) and brought it back.
* The flatcar had stone on it, and the stone was emptied on various tracks.
* Steam: #9 was fired up for a birthday party (an 80th+ party - I forget how old exactly), which had Coach 3 and the caboose on the 11 AM train. Then the 12:30 train had a troop of boy scouts. The 2:30 train was a 5-car train with the flatcar, switching it into place then returning, with the diesel having followed and the diesel was used to bring it back.
#9 was put on the turntable over lunch for a photographer from the newspaper to report on. It was then rotated a full 360 before going back on the train. Then after the last train, after putting the train away, with the diesel and bulldozer/flatcar occupying the roundhouse run-through track it went back on the table to go over a few degrees to the run-through track where it sparked the firebox.