Welcome,
Guest
. Please
login
or
register
.
1 Hour
1 Day
1 Week
1 Month
Forever
Login with username, password and session length
News:
Current News
Home
Help
Search
Login
Register
W.W.&F. Discussion Forum
»
WW&F Railway Museum Discussion
»
Museum Discussion
»
10 + 11 = 21: WW&F needs 2 New Boilers
« previous
next »
Print
Pages:
1
...
4
5
[
6
]
7
8
Go Down
Author
Topic: 10 + 11 = 21: WW&F needs 2 New Boilers (Read 91644 times)
Paul Uhland
Museum Member
Dispatcher
Posts: 1,074
Re: 10 + 11 = 21: WW&F needs 2 New Boilers
«
Reply #75 on:
January 26, 2017, 06:32:13 PM »
Great to see needed boiler parts at WW&F sans an expensive semi fee!
Wonder if anybody there is really ready to 'get on it', as a former boss used to say.
A great way to spend the winter.
Logged
Paul Uhland
Rick Rowlands
Museum Member
Brakeman
Posts: 172
Re: 10 + 11 = 21: WW&F needs 2 New Boilers
«
Reply #76 on:
January 28, 2017, 09:20:57 AM »
Amazing progress taking place. Boiler Kit on a flatcar, some assembly required.
The dome lid blanks appear to be rather thick. I assume they are going to be machined into a dish shape.
Logged
Rick Rowlands
Chief Engineer
J&L Narrow Gauge Railroad
Youngstown, OH
John McNamara
Operating Volunteers
Supervisor
Posts: 1,637
Re: 10 + 11 = 21: WW&F needs 2 New Boilers
«
Reply #77 on:
January 28, 2017, 08:23:46 PM »
Word has it that Stewart made an illuminating discovery at the Amherst Show.
-John M
Logged
Jeff Schumaker
Museum Member
Inspector
Posts: 1,436
Re: 10 + 11 = 21: WW&F needs 2 New Boilers
«
Reply #78 on:
January 29, 2017, 01:05:49 PM »
So, when will we be "enlightened"?
Jeff S.
Logged
Hey Rocky, watch me pull a moose trout out of my hat.
John Kokas
Museum Member
Supervisor
Posts: 1,818
Re: 10 + 11 = 21: WW&F needs 2 New Boilers
«
Reply #79 on:
January 29, 2017, 02:13:08 PM »
Don't tell me Stewart came across #7's original headlight! That would be totally awesome ........
Logged
Moxie Bootlegger
Ira Schreiber
Museum Member
Dispatcher
Posts: 1,070
Life Member
Re: 10 + 11 = 21: WW&F needs 2 New Boilers
«
Reply #80 on:
January 29, 2017, 02:24:10 PM »
If so, it would be one of Stewart's brightest moves.
Logged
Bill Reidy
Museum Member
Supervisor
Posts: 1,527
Life member. Ack.
Re: 10 + 11 = 21: WW&F needs 2 New Boilers
«
Reply #81 on:
January 29, 2017, 02:25:30 PM »
Stewart is a shining example of what Museum volunteers can do.
Logged
We want...A SHRUBBERY! One that looks nice, and not too expensive.
Mike Fox
Museum Member
Empire Builder
Posts: 5,923
Re: 10 + 11 = 21: WW&F needs 2 New Boilers
«
Reply #82 on:
January 29, 2017, 03:35:26 PM »
You guys really know how to lighten up the conversation..
Logged
Mike
Doing way too much to list...
John Kokas
Museum Member
Supervisor
Posts: 1,818
Re: 10 + 11 = 21: WW&F needs 2 New Boilers
«
Reply #83 on:
January 29, 2017, 04:10:25 PM »
Yeah, but if we go too far off track the moderator takes a dim view of it
Logged
Moxie Bootlegger
Jeff Schumaker
Museum Member
Inspector
Posts: 1,436
Re: 10 + 11 = 21: WW&F needs 2 New Boilers
«
Reply #84 on:
January 30, 2017, 04:22:42 PM »
Quote from: John Kokas on January 29, 2017, 04:10:25 PM
Yeah, but if we go too far off track the moderator takes a dim view of it
It could be lights out for us, then.
Jeff S.
Logged
Hey Rocky, watch me pull a moose trout out of my hat.
Ted Miles
Museum Member
Fireman
Posts: 389
Re: 10 + 11 = 21: WW&F needs 2 New Boilers
«
Reply #85 on:
January 30, 2017, 06:46:58 PM »
Folks,
Now that the boiler sheets have been rolled with they be shipped to the Boothbay Shop or will all the rest of the work on #10 boiler be done in the WW&F Railway Shop?
That new flanging machine is really something!
Ted Miles, WW&F Member
Logged
Jason M Lamontagne
Operating Volunteers
Supervisor
Posts: 1,878
Re: 10 + 11 = 21: WW&F needs 2 New Boilers
«
Reply #86 on:
January 30, 2017, 07:14:31 PM »
The boiler components are at Sheepscot for some minor prep work by our shop, after which the drums will be delivered to Boothbay personnel to have their long seams welded. These and the two interior firebox seams are the only welded joints in the entirety of both boilers. The heads and wrappers will remain at sheepscot for flanging operations. Riveting will commence in sheepscot shops under Boothbay direction following these steps.
Jason
Logged
Mike Fox
Museum Member
Empire Builder
Posts: 5,923
Re: 10 + 11 = 21: WW&F needs 2 New Boilers
«
Reply #87 on:
July 27, 2017, 06:09:05 PM »
Let's get this campaign where we are thinking about it again. Steve P. has put together a nice short video, and has allowed it to be shared here by setting up a You Tube channel for the Museum. So, without further delay, here is Steve.
https://youtu.be/XorZitQoJcM
[Moderator's Note: Updated Mike's link]
Mikes note..I fixed it so it worked..
«
Last Edit: July 28, 2017, 03:39:31 PM by Mike Fox
»
Logged
Mike
Doing way too much to list...
Stephen Piwowarski
Museum Member
Conductor
Posts: 811
Re: 10 + 11 = 21: WW&F needs 2 New Boilers
«
Reply #88 on:
July 27, 2017, 06:24:56 PM »
Thanks Mike! The location of that video has been updated- it is now located on the existing WW&F YouTube page at:
https://youtu.be/XorZitQoJcM
. Check it out!
Meanwhile...
Number 10's boiler barrel is in the process of having its long seam welded at Boothbay Railway Village.
Back at Sheepscot, flanging has been underway for some time. At this point, the door sheet and rear tube sheet are complete, the front tube sheet is essentially complete, and the backhead is midway towards completion. The last sheet to flange for Number 10's boiler is the throat sheet. Work will begin on the throat sheet shortly.
Take care,
Stephen
«
Last Edit: July 28, 2017, 06:55:29 AM by Stephen Piwowarski
»
Logged
John McNamara
Operating Volunteers
Supervisor
Posts: 1,637
Re: 10 + 11 = 21: WW&F needs 2 New Boilers
«
Reply #89 on:
July 27, 2017, 08:23:22 PM »
Steve has written a nice
WW&F Newsletter
article about flanging.
Logged
Print
Pages:
1
...
4
5
[
6
]
7
8
Go Up
« previous
next »
W.W.&F. Discussion Forum
»
WW&F Railway Museum Discussion
»
Museum Discussion
»
10 + 11 = 21: WW&F needs 2 New Boilers