Author Topic: 2015 Fall Work Weekend  (Read 54933 times)

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,914
    • View Profile
Re: 2015 Fall Work Weekend
« Reply #45 on: October 03, 2015, 07:47:29 PM »
Good old fashioned two holer for Alna Center?
Mike
Doing way too much to list...

Ira Schreiber

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,070
  • Life Member
    • View Profile
Re: 2015 Fall Work Weekend
« Reply #46 on: October 03, 2015, 08:05:36 PM »
Thomas the Tank Engine do-it-yourself kit?

Wayne Laepple

  • Museum Member
  • Yardmaster
  • *******
  • Posts: 2,123
    • View Profile
Re: 2015 Fall Work Weekend
« Reply #47 on: October 04, 2015, 07:19:40 AM »
It's a chicken coop on wheels! :D

John Kokas

  • Museum Member
  • Supervisor
  • ******
  • Posts: 1,818
    • View Profile
Re: 2015 Fall Work Weekend
« Reply #48 on: October 04, 2015, 11:33:02 AM »
Best I can tell from the picture is its not lumber for the car barn.  Could it possibly be a long lost /newly acquired WW&F car or sections of one?
Moxie Bootlegger

Jason M Lamontagne

  • Operating Volunteers
  • Supervisor
  • ******
  • Posts: 1,877
    • View Profile
Re: 2015 Fall Work Weekend
« Reply #49 on: October 05, 2015, 02:48:55 PM »
Work Weekend Projects, Priorities and Foreman

Main effort:  car barn and north yard tracks
By general priority:
1.  Retrieve 50 lb rail- Dana
2.  Cut ties- Fred
3.  Survey/ Lay out woods track curve- Rick
4.  Lay out switch ties and frogs- Rick and Jason
5.  Build Curve- Dana
6.  Build barn track 1 (50 lb, construct north to south)- Dana
7.  Build barn tracks 2&3 (33 lb, construct south to north)- Dana
8.  Align woods track curve- Rick
9.  Build switches- Rick and Jason
10. Build woods track- Dana

Other projects:
11.  Main line track joint repair- Bill Baskerville
12.  No 9 tank install- Wayne (if he says yes!)
13.  No 9 cab- Marcel
14.  Other no 9 stuff- Jason
15.  Car barn siding- Zack
16.  Whitefield section house- Steve Piwowarski

« Last Edit: October 05, 2015, 03:22:06 PM by Ed Lecuyer »

Jason M Lamontagne

  • Operating Volunteers
  • Supervisor
  • ******
  • Posts: 1,877
    • View Profile
Re: 2015 Fall Work Weekend
« Reply #50 on: October 05, 2015, 02:51:54 PM »
The track plan has been revised to two conventional switches, built along the curve into the woods track.  The layout plan prevents the switch's pre construction, hence the above order of operations.  The switches will be laid out as point switches, but built as stubs for now. 

Maybe we can get a pic of the new layout posted...

Questions welcome!

Jason

Jason M Lamontagne

  • Operating Volunteers
  • Supervisor
  • ******
  • Posts: 1,877
    • View Profile
Re: 2015 Fall Work Weekend
« Reply #51 on: October 05, 2015, 02:59:57 PM »
Feel free to speak up (Mike, anyone) if my list missed anything.  We'll revise the big list I posted rather than make addenda...

Jason

Brendan Barry

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,124
    • View Profile
Re: 2015 Fall Work Weekend
« Reply #52 on: October 05, 2015, 06:53:37 PM »
New track plan for the car barn leads and Woods track in the North Yard.

United Timber Bridge Workers, Local 1894, Alna, ME

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,914
    • View Profile
Re: 2015 Fall Work Weekend
« Reply #53 on: October 05, 2015, 08:29:28 PM »
I hope someone converts that to feet.  ;D

I think you have it covered. All under track drains are in. Grading is close enough. May still be a puddle on the south west side, too much in the way to finish the ditch across the south side of the building.
Mike
Doing way too much to list...

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,914
    • View Profile
Re: 2015 Fall Work Weekend
« Reply #54 on: October 05, 2015, 09:16:10 PM »
Just thought of...if there is a slow moment for the track construction, the low spot on the track that is there now could be lifted and hand tamped. Gravel at AC that could be used?
Mike
Doing way too much to list...

Jason M Lamontagne

  • Operating Volunteers
  • Supervisor
  • ******
  • Posts: 1,877
    • View Profile
Re: 2015 Fall Work Weekend
« Reply #55 on: October 05, 2015, 09:19:53 PM »
Possible, certainly.

I see rain is forecast for Friday afternoon.  Good thing there's track to build inside a building...

Jason

Paul Uhland

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,074
    • View Profile
Re: 2015 Fall Work Weekend
« Reply #56 on: October 06, 2015, 12:30:14 AM »
As I understand it, the planned tri-stub-switch trackage geometry  needs more room , so two narrower point switches following each other as shown will work.
Looks like you guys are ready to rip. Good luck.

Please don't spare the pics. TMTM!
Paul Uhland

Jason M Lamontagne

  • Operating Volunteers
  • Supervisor
  • ******
  • Posts: 1,877
    • View Profile
Re: 2015 Fall Work Weekend
« Reply #57 on: October 06, 2015, 06:22:57 AM »
It's the other way around.  The two switch arrangement requires a gentler woods track curve and takes more room.  The 3- way stub crams the converging tracks into one place and takes less room.  That's why 3- ways were used.

We weren't looking to build another 3-way; one's enough.  They take an extra frog and a special throwing arrangement and stand.  We only chose it because a conventional ladder track to feed the car barn was simply not going to fit (with reasonable curves).

We recently reevaluated and determined that we have enough width of the ladder track carries a coninuous curve- laying the two switches along the curve and letting the divergent track carry whatever curve it does.  They end up being neither left, right, or evenly split angle switches but rather something in between.  Reality is, in fact, it doesn't matter for switch layout- there's a datum track (woods track on a curve), and a diverging track (diverging to the left for the car barn).

The curving ladder isn't ideal- but it's better than a 3-way.  This isn't high traffic- and its in keeping with Maine narrow gauge practice.  Amongst other examples, take a look at the 3 way in Phillips yard on the original Sandy River RR; all 3 tracks curve through the switch.

See ya
Jason

Gordon Cook

  • Museum Member
  • Engineer
  • ****
  • Posts: 525
  • Board Member 2009-2015
    • View Profile
Re: 2015 Fall Work Weekend
« Reply #58 on: October 06, 2015, 08:46:59 AM »
If there is time I suggest it would be prudent to fix a few dips in the mainline;

1. A few rail lengths north of Jayne's Way (#10 bounces around a bit, much fun but gets in the way of whistle artistry)
2. North of phantom crossing the usual slide of the ballast to the east
3, There's one south of Rosewood (sp?) that isn't too bad but definitely there
4. south of Sutters in the curve the joints seem low and 10 kind of bangs around them heading south
Gawdon

Paul Uhland

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,074
    • View Profile
Re: 2015 Fall Work Weekend
« Reply #59 on: October 06, 2015, 09:09:41 AM »
Jason...thanks for the explanation. The track chart shows the woods track now on a smooth, constant radius curve, no doubt easier to lay out and build.
Building the two "new" switches and aligning with  barn spurs 2 and 3 will be challenge enough.
Brings back memories of my summer survey crew job on I-40 through Abq years ago.
Hope the wx cooperates.

BTW...during Abq's Balloon Fiesta going on this week, there is a B-17 and a B-29 flying around over the city, no doubt giving WW2 vets and touristers thrill rides.
The '17 is the  louder of the two.
We don't usually see/hear big multi-engine prop planes around here, except for NMANG C-130s  from Kirtland AFB mostly on Tuesday qual flights.
 
Hope the Vermonter derailment doesn't interfere with arriving WWF workers.
« Last Edit: October 06, 2015, 09:26:44 AM by Paul Uhland »
Paul Uhland