Work done on Saturday July 27:
* Trask Crossing planks: We went to replace the inner planks, and realized we didn't have all the tools we needed. A call back to Sheepscot brought Fred with some extra tools. We tore out the inner planks, cut off the nails, and put down two planks and safety spiked them. We need to revisit this at some point to notch out the planks for tie plates and put in thinner shims.
* Percival Basement: It's been cleaned out, the stairs removed. Sounds like the basement will be poured this week!