February 2013 Work Planning
« on: January 30, 2013, 07:07:17 AM »
Anticipated work for Saturday Feb 2:

* Restrooms
* #9: No Jason, but there's work to do if people know what to do

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,445
  • Loco for 6
    • View Profile
Re: February 2013 Work Planning
« Reply #1 on: February 02, 2013, 06:13:34 PM »
Work done on Feb 2:

* Restrooms: Steve cut the trim for the windows.
* Trees: Fred cut down another tree that was leaning wrong.
* #9: Eric and Wes worked on the equalizing bars, primarily the one on the fireman's side.
* Crane: Mike worked on a framework to attach to the rear of the crane so that he can hang a counterweight.

Fred Morse

  • Museum Member
  • Engineer
  • ****
  • Posts: 642
    • View Profile
Re: February 2013 Work Planning
« Reply #2 on: February 03, 2013, 06:58:05 AM »
The tree we cut down was the last tree that had to be removed behind the section house. The tree was mostly dead. as it was only 20 feet from the building we put it across the track. The live limb broke the fall and no damage was done. Srewart and Mike made a few trips with the little flat car to pick up the pieces. They also spent the morning cleaning up the wood cut earlier where the track is to be laid. Stewart will be nice and warm next winter. Were cutting very slow in that area as we don't want it to look barren, however its easily to cut them now then after buildings and track are in place.

Stewart "Start" Rhine

  • Museum Member
  • Superintendent
  • ********
  • Posts: 3,032
    • View Profile
Re: February 2013 Work Planning
« Reply #3 on: February 03, 2013, 07:50:53 AM »
Hi Fred,  It was J.B. and I that hauled two good sized loads of wood on the push car. Good thing we were within the Yard Limit since we didn't have a waybill for the freight. The area between the spur and mainline looks a lot better now. 

After lunch, Zack and I ran the new restroom water feed line through the cellar of the Percival house.  Zack installed a new filter unit where the line goes out of the cellar.

Stewart

Fred Morse

  • Museum Member
  • Engineer
  • ****
  • Posts: 642
    • View Profile
Re: February 2013 Work Planning
« Reply #4 on: February 03, 2013, 01:10:23 PM »
Sorry!  You know I play musical chairs with names even on the computor.

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,445
  • Loco for 6
    • View Profile
Re: February 2013 Work Planning
« Reply #5 on: February 06, 2013, 07:15:03 AM »
Anticipated work for weekend of Feb 9:

Friday:
* Board meeting at 4:30.  It may be postponed if there's significant snow (which is forecast for Friday).

Saturday:
* Restrooms
* #9
* Trees?

John Kokas

  • Museum Member
  • Supervisor
  • ******
  • Posts: 1,796
    • View Profile
Re: February 2013 Work Planning
« Reply #6 on: February 06, 2013, 05:43:22 PM »
Looks like the opportunity for more "plow train" videos is in the offing.  (wishful thinking)
Moxie Bootlegger

Stewart "Start" Rhine

  • Museum Member
  • Superintendent
  • ********
  • Posts: 3,032
    • View Profile
Re: February 2013 Work Planning
« Reply #7 on: February 07, 2013, 08:18:34 AM »
This week -

#9 - Jason and Jonathan worked on the driving boxes. Jonathan spent two days in the shop due to the number of set-ups required

Crane car - Mike worked on the counter weight assembly (see report on crane car thread)

Restrooms - Steve hung the interior doors and installed the trim.  He painted top coat on the doors and woodwork

Generator - Stewart installed a new exhaust system on the 3 phase generator for the shop.  There's no flap cap yet so a bean can is on top, remove before starting.

« Last Edit: February 07, 2013, 08:28:17 AM by Stewart Rhine »

Fred Morse

  • Museum Member
  • Engineer
  • ****
  • Posts: 642
    • View Profile
Re: February 2013 Work Planning
« Reply #8 on: February 07, 2013, 08:23:29 AM »
If I am going to be cleaning up snow Sat. morning I probably won't be there.  Fred

Stewart "Start" Rhine

  • Museum Member
  • Superintendent
  • ********
  • Posts: 3,032
    • View Profile
Re: February 2013 Work Planning
« Reply #9 on: February 07, 2013, 08:35:05 AM »
Fred, there may not be anyone at the railroad Saturday morning.  Computer models predict a true nor' easter this weekend with snow accumulating up to two feet in the mid-coast region.  Snowfall will begin Friday morning and continue through Saturday afternoon.  Wind gusts will be at 25-35mph so there will be drifting snow.

Updates:

www.wcsh6.com

www.accuweather.com
« Last Edit: February 07, 2013, 08:40:51 AM by Stewart Rhine »

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,445
  • Loco for 6
    • View Profile
Re: February 2013 Work Planning
« Reply #10 on: February 07, 2013, 05:50:22 PM »
The Friday board meeting has been postponed until the 15th.

Stewart "Start" Rhine

  • Museum Member
  • Superintendent
  • ********
  • Posts: 3,032
    • View Profile
Re: February 2013 Work Planning
« Reply #11 on: February 10, 2013, 12:04:11 PM »
After digging the truck out Cindy and I decided to check things at the railroad. Jeff plowed the two parking areas and cleared in front of the shop.  We dug our way into the east shop door (snow was above the door knob) and everything looks fine.  Note to Monday crew:  Come in the east door unless you want to do a lot of shoveling.  The north shop door is clear but the west side walkway is blocked. The strong winds did some odd snow sculpting.  There's no snow for the first 6 feet north the shop building, clean as a whistle.  Then you walk right into 3-4 foot drifts.  The south and west sides of the shop are snowed in.

Cindy posted some photos on facebook.

Paul Crabb

  • Museum Member
  • Brakeman
  • ***
  • Posts: 156
  • Life Member
    • View Profile
Re: February 2013 Work Planning
« Reply #12 on: February 12, 2013, 09:49:14 PM »
I haven't seen anything about this weekends Winter Work Weekend. Have I missed it or is it not an individual thread? Just wondering what is planned.

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,445
  • Loco for 6
    • View Profile
Re: February 2013 Work Planning
« Reply #13 on: February 13, 2013, 07:08:31 AM »
Anticipated work for weekend of Feb 16:

Friday
* The board meeting that was supposed to be on the 8th will be the 15th

Saturday, Sunday, Monday
* #9
* Restrooms
* Brendan is delivering our new trailer.  Let's lay track on it!
* Snow shoveling.  I doubt we will be plowing.
* Fred may have some trees to cut down.

As noted, this is the Winter Work Weekend.

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,864
    • View Profile
Re: February 2013 Work Planning
« Reply #14 on: February 13, 2013, 07:28:56 PM »
I plan on doing a little counterweight work. But due to all the snow, the crane will most likely not get the weight attached this weekend as I had planned.
Mike
Doing way too much to list...