Work done Saturday Nov 19:
* Friday Zack was working on the reefer, working on draft gear.
* During the week, Leon took some of the junk steel to the scrapper.
* Also during the week, Steve Z painted the south wall of the station.
* Brendan arrived with his trailer. Last week Galo Hernandez rescued some sizeable timbers in Thomaston, so Brendan, Steve Z, Fred, and JB went to Thomaston, loaded them on the trailer, and returned. Some of the timbers are over 30 feet long. The plan is to store them for now (where I don't know).
* A group of us went north to the junk pile at the trestle and brought back a flatcar's worth a junk timbers. The good, square pieces were put on the free tie pile, and the rest were put on the AA truck and sent to the transfer station. It was surprisingly cheap to get rid of it, so I think we'll be sending more junk to the transfer station.
* After lunch we had the class and drill. The drill ended up being more of a discussion of good procedures to follow. A real drill is planned for spring with the fire company.
* Leon spent the day reaming holes for #9.
* Zack did more work on the reefer.