Work done on Jan 9.
This week, Jonathan and Vern got the Brookville back on its wheels. The running gear overhaul is winding down, by the looks of it. Of course it still needs an engine overhaul. Our electrician, Josh, is also into old engines so he'll be tackling that.
On Saturday:
* We continued cutting west of the house. We cut down a mighty big pine tree, and left some of it for next Saturday.
* Hans worked on #9 frame.
* Jason and Gordon cleaned out the tubes of #10.
* Later we cleared the tracks on Bay 4, rolled out the engine, and it was drained and pressure washed. Then Jason proceeded to pressure wash the pit. This effort succeeded in removing all the debris from the pit (Gordon cleaned out 2 buckets of black matter), and Jason succeeded in getting himself covered in black matter too.
* Bill continued working on his project, which I'm guessing is for #9, involving the small milling machine.