Brendan was kind enough to drive the loader to the North End for me this morning. Contractor Jeff had left me 3 loads of material.
Before lunch I lugged 8 loads south. To make sure I was getting all I could in the bucket, I walked up and got the Kubota and topped off the loader bucket to lug all I could. With 10 to 12 minute trip cyle times, it would not take many partial bucket fulls to add a significant amount of time to the day.
After lunch I had lugged another 7 bucket fulls up, then fired up the dozer.
Then, end of the day, I had brought up an additional 11 bucket loads. 3 dump truck loads equals 26 bucket loads. Phew..
Left some tracks..I will doze them in tomorrow..
Looking south from the bridge..
Looking south from my truck