Started off this morning, with the help of Ken Berlo, off setting all the center line stakes, and a couple of reference stakes, like the frog and some measurement stakes. Then went to work with the Kubota.
Contractor Jeff showed up, and we looked the ditch over. He figures in about 2 weeks he may get to it. He rough guessed the same amount of material that I had figured. It will take him a few days to do.
Had a flat surface, so I loaded it. Fred is getting antsy, wanting to cut, so next Saturday, he will get these..
Setting the rest of the culvert at Location 10
I have been filling the hole a little at a time with the better material from the ditches. The topsoil with the roots have been cast aside to cover the slope when I finish.
A look at the ditch I have created to get some material.
I could see the bridge from the Kubota at that spot..
Picking roots from the ditchings and this showed up. I didn't beat the rust off, but appears to be a broken joint bar.