Re: Mountain Extension - Official Work Thread
« Reply #930 on: April 22, 2019, 06:18:46 AM »
A few pictures I grabbed Saturday..







Looking at the bridge from Sawmill Curve
Mike
Doing way too much to list...

John Kokas

  • Museum Member
  • Supervisor
  • ******
  • Posts: 1,699
    • View Profile
Re: Mountain Extension - Official Work Thread
« Reply #931 on: April 22, 2019, 07:15:35 AM »
Wow!  The ROW opened up really well.  Great job guys!  Looks like a whole bunch of wood still to come down to Sheepscot for splitting and stacking.  I assume its not firm enough yet to get a pickup truck in to pick stuff up.
Moxie Bootlegger

Paul Uhland

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,074
    • View Profile
Re: Mountain Extension - Official Work Thread
« Reply #932 on: April 22, 2019, 11:46:55 AM »
Thanks, Mike.
You Sheepscot Supermen have done it again!
Congratulations, also for the successful Easter Eggspress.

A great prelude to this coming weekend's 2019 SWW.  ;)
 



















« Last Edit: April 22, 2019, 11:59:35 AM by Paul Uhland »
Paul Uhland

Bill Reidy

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,415
  • Life member. Ack.
    • View Profile
Re: Mountain Extension - Official Work Thread
« Reply #933 on: April 22, 2019, 05:02:25 PM »
Sure looks different with the snow gone.  Thanks Mike.
What–me worry?

Bill Reidy

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,415
  • Life member. Ack.
    • View Profile
Re: Mountain Extension - Official Work Thread
« Reply #934 on: April 26, 2019, 08:26:19 PM »
Photos of Mountain Extension ballasting work can be found in the Spring Work Weekend thread.
What–me worry?

Bill Reidy

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,415
  • Life member. Ack.
    • View Profile
Re: Mountain Extension - Official Work Thread
« Reply #935 on: April 27, 2019, 10:30:47 PM »
Saturday Spring Work Weekend photos on the Mountain Extension can be found here.
What–me worry?

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,634
    • View Profile
Re: Mountain Extension - Official Work Thread
« Reply #936 on: April 28, 2019, 07:54:42 AM »
Rick Sisson has done some surveying and led a crew to get ready for the next leg of the extension. Here are some photos of the curve between location 10 and 11. These stakes mark the centerline, and will help guide the grading work trough the curve.


Looking South


Looking North toward the bridge
Mike
Doing way too much to list...

Brendan Barry

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,064
    • View Profile
Re: Mountain Extension - Official Work Thread
« Reply #937 on: April 29, 2019, 07:42:18 PM »
Walking north from the end of track to the bridge Sunday morning.





















Looking back south from the bridge.

United Timber Bridge Workers, Local 1894, Alna, ME

Joseph Lupinski

  • Gandy Dancer
  • *
  • Posts: 19
    • View Profile
Re: Mountain Extension - Official Work Thread
« Reply #938 on: April 30, 2019, 07:47:59 AM »
Excited for this Fall.  Is the plan to add some stone and regrade the remaining surface to the bridge?  That area seemed a bit swampy when took a walk down there.

Joe Fox

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,275
    • View Profile
Re: Mountain Extension - Official Work Thread
« Reply #939 on: April 30, 2019, 09:21:47 AM »
The grade from end of track to the bridge needs to be graded to get the old ties and stumps out, rebuild the ditch on the East side and put in rip rap rock and fill as needed. That work will begin once the permit dates are effective again as the wetland permit we have is only good 3 months per year for two years. This being the second year on the permit.

For the Fall Work Weekend our goal is to build 2,000' of track. Which will require 150 rails, 300 joint bars, 1,000 ties, 4,000 spikes, and 600 bolts and washers to be readied ahead of time.

Roger Cole

  • Museum Member
  • Hostler
  • ***
  • Posts: 227
    • View Profile
Re: Mountain Extension - Official Work Thread
« Reply #940 on: April 30, 2019, 10:31:20 AM »
Will a runaround track just before Rt 218 be part of the FWW tracklaying or will that come later?

Bill Piche

  • Museum Member
  • Fireman
  • ****
  • Posts: 385
    • View Profile
Re: Mountain Extension - Official Work Thread
« Reply #941 on: April 30, 2019, 01:03:58 PM »
Will a runaround track just before Rt 218 be part of the FWW tracklaying or will that come later?

I think that will depend on if there's a switch available to be installed when we get there.

Is there enough room that we could run ballast from EOT next year rather than taking the heavy stone trains down the mountain?
Engineer/Fireman, MNGRR/WW&F/Essex
"Any day with steam is a good day." - me

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,216
  • Loco for 6
    • View Profile
Re: Mountain Extension - Official Work Thread
« Reply #942 on: April 30, 2019, 01:42:12 PM »
I think the plan is to get the track across the bridge and close to 218 at 2019 FWW, then ballast and tamp at 2020 SWW.  That allows 2020 FWW to put in the siding and switches, and perhaps even ballast what was missed at SWW.  Finally 2021 SWW is for whatever is left to do before the grand opening.  Hopefully there'll be very little to do.

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,634
    • View Profile
Re: Mountain Extension - Official Work Thread
« Reply #943 on: April 30, 2019, 02:39:42 PM »
James is correct. Fall Work Weekend will see track laid as far as possible, with the siding laid the following year.

There is no room to load ballast there, but we may have some loads delivered there and put down as a base. We will not be able to do this south of the siding due to it will be too narrow after we dress it up a little unless we use our truck, which means loading it at AC or Sheepscot, and trucking it up, and doing it a little at a time. I had hoped to do that last fall, but time was up.
Mike
Doing way too much to list...

Gary Kraske

  • Museum Member
  • Switchman
  • **
  • Posts: 99
    • View Profile
Re: Mountain Extension - Official Work Thread
« Reply #944 on: April 30, 2019, 05:27:49 PM »
For the Fall Work Weekend our goal is to build 2,000' of track. Which will require 150 rails, 300 joint bars, 1,000 ties, 4,000 spikes, and 600 bolts and washers to be readied ahead of time.

Joe, do we have all the materials stated above?  Understand from Fred's post that ties need to be cut.  Unfortunately all, we can contribute is money towards the effort.  We are trying to decide where to specify our donations to WWFRy this year, in addition to next year's annual budget.  Thanks
Barb & Gary