Current News
Jeff, we have made it within 50 feet of the Alna Shoreland Zone permitted area. That starts in the cut. One more load will do it. Our contractor is using the same method he did with the fill of the washout last year, which is more compaction than the original had. Proper drainage and keeping the trees off the slope will help keep this stable for a long time.
Once that 50 ft is graded, what's next?Jeff S.