Without going into great detail, the only thing that will be done in section 7 is what is needed to be able to work on the bridge site. Location 14 is a spot that will get fixed, mainly because it needs a culvert, so we can easily access the bridge site. Part of the culvert will be temporary, so when we are done the roadbed can be narrowed back up to original width.
Once the heavy work is done, the rest of the pipe work can be completed.