Fred and Al showed up, right on time, and I helped them cut and load the first load. They left and unloaded it, came back,with wedges, and he cut and I split the bigger pieces. They left and returned again before lunch, and took the last of the wood.
I leveled the gravel contractor Jeff left.

I then dug the last ditch, and cut down the high spot the logs were on. I drove the tractor up after lunch and lugged the tailings to the curve to build up the inner slope.
All that is left for me will be level the gravel that contractor Jeff will bring. I will move the equipment out Saturday morning when I finish grading, moving south to the access road and walking the equipment in to location 5.
Slide repair is on hold while the ground dries out again.





Looking at the bridge location.

Same spot turned North


Standing next to my truck looking North. Excavator is sitting where the siding will be.