We had a fairly good weekend on the Naugy. We ended up having three track projects going on plus work inside the shop on a replacement EMD 567 diesel engine for B&M 1732, the shop building electrical system, ex CNR coach 5805 and caboose (van) CV 4014. Support crews also supplied lunches in two locations Saturday and one on Sunday.
When rebuilding a private crossing at the north end of the Thomaston passing track we found that the base of the rails in the crossing had a lot of rust damage so four rails will have to be replaced, so that part of the project will continue.