The Maine Narrow Gauges (Historic & Preserved) > Archives (Other Maine 2ft)
progress on car 22
(1/1)
Ed Lecuyer:
MODERATORS NOTE:
progress on car 22 has been converted from the pre-July 2008 WW&F Discussion Forum.
Some formatting may have been removed or modified from the original postings that appear quoted in this topic.
Information contained within this post may be superseded by more recent postings and conversations.
Shawn Cavaretta wrote:
--- Quote ---well i got to mng at about 10. i had to spend about 1 1/2 clearing snow from inside the car because the tarps blew off. once that was dont i took some measurements of the wall framing so i can make a drawing up to have for when the car gets reframed.
then i started to cut out the rotten framing so i could acess the sill. i had to remove some of the rotten wood from the floor. then once that was dont i was able to start to remove the sill.
i have also started to mark and cut the new PT 2x6 that will be used to build the new sill.
i hope next week to remove the rest fo the rotten wall framing and sill.
then the following week build and install the new sill
check out the photo galery for pictures.
www mngrr org/car22gallery/38 html
(add dots were the spaces are after www and mngrr and before html)
--- End quote ---
Joe Fox replied:
--- Quote ---Thanks for the info Shawn.
Joe
--- End quote ---
Navigation
[0] Message Index
Go to full version