Hi All,
As I do not have specifics on other projects that might be happening during work weekend, I do however have the plan for the track work to be done.
The Track Project for this fall will be to lift and tamp some spots along our main line. Most of these spots are low joints along the portion of the line between the bottom of the ladder on rosewood crossing. There are other smaller track lifts at Hummison Brook Bridge and along the Mountain that we hope to hit as well. Along with the track lifts, I plan to be prepared with materials and equipment for tie changing as well, so that if we come across a tie in need of changing, we can do so. I plan to start bright and early with the first work train departing at 8, hopefully every morning, with a crew shuttle making a return trip to pick up any stragglers. I still have to finalize details with Nancy about lunch but I hope to return to having lunch out on the line where we are working.
I will have another post in the coming days with more finalized details.
Hope to see everyone at Sheepscot.
- Dan