Saturday May 11 2024 marked the formal beginning of assembly for the excavator cart, assigned MoW#1018.
James and Brendan worked on assembling the floating wheel carriage, which provides equalization for the 4 wheel cart.
Today, my father and I began assembling the main frame, after unloading and separating most laser cut components from the crate.
Assembly and welding will be complete this month. Following this we have to build the hydraulic system, followed by the control system.
We will try to keep this thread updated.
Jason