Work done on Saturday March 30:
* Inspection trip: Last night into today the wind really blew, so we ran an inspection trip up the line to clear out any blowdowns. There were none on the track, so Bryce created some by felling dead leaning trees. We also cleaned up branches on the ROW.
* Vacuum brakes: A group of some of the younger folks are interested in the vacuum brake project, so Jason was giving them tasks to do.
* Platform: Brendan was laying out ties on the very wet ground for the heavy equipment to drive on. Zack was removing bolts that had held up the platform by the gift shop.
* Vehicles: Mike put on the radiator for the front end loader, put it all back together, and started it.
* Easter Eggspress - three sold out passenger trains to SeaLyon Farm for an Easter Egg hunt, etc.