Work completed Tuesday and Wednesday 11-12 April 2023

Tuesday:
*  Track crew,preps materials for SWW, rail, ties, spikes etc.
    (Steve Lx, Steve Lt, Brian W, Paul R, Leon, Dan, Ty Dixon)
*  Coach #9 work continues (Eric, Ron, Seth)
*  Passenger car Trucks rebuild continued (Jerry, Carlos)
*  Engine House shingling, trim  (Stewart, Zack, Fred)
*  Archives work continues  (Linda)
*  Gift shop and mail, Monday through out the week. (Cindy R)
*  Admin,  (Dave B, Jason)
*  Parking lot excavation. (Brendan, Jeff Varney)

Wednesday:
*  Parking lot clean up.  (Brendan, Steve Lx, Brian W, Fred)
*  Parking Lot excavation, (Brendan, Jeff Varney)
*  Coach #9 work continued (Eric, Ron)
*  Vacuum brakes on and off site  (Jonathan)
*  Vehicle repair: Harsco Tamper heads tightened, Big Joe trouble shooting motor and compressor,
                             Tie changer trouble shooting. Both machines need parts replacement.
                             (Brian W, Steve Lx)
*  Locomotive #9 maintenance (Roger, Wes C)
*  Engine House shingles and trim  (Stewart)
                                   

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,356
  • Loco for 6
    • View Profile
Re: April 2023 Work reports
« Reply #16 on: April 15, 2023, 04:50:11 PM »
Work done on Saturday April 15:

* Drainage work: Mike (sort of assisted by me) dug out for 3 pipe lengths in the parking lot and put in the last catch basin.  I tried my hand at using the excavator, and have to say that Mike makes it look easy.
* Engine house: Stewart worked on the windows.
* Boxcar 56: Marcel was starting to put tin on the roof.
* Archives room: The folks building out the archives room were putting up sheetrock.
* Grant work: Nicole and Ed were working on grant prep.

Dave Buczkowski

  • Museum Member
  • Dispatcher
  • *****
  • Posts: 1,007
  • Life Member
    • View Profile
Re: April 2023 Work reports
« Reply #17 on: April 15, 2023, 07:32:40 PM »
Also, Bill and Dave traveled to Ossipee, N.H. to pick up a van load of books, magazines, ephemera and other railroad stuff left to the WW&F by Dwight.
Dave

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,758
    • View Profile
Re: April 2023 Work reports
« Reply #18 on: April 15, 2023, 08:56:36 PM »
Got the trench for the first pipe dug quickly.



Started backfilling



All done with the first one, tried to be quick to allow full access to the house



And Fred got the riding tractor running..



More digging





Ready for the last piece of pipe..



With a little extra help from Steve P. and Johnny, we got it in.



Filled in and semi smooth..



I will be working in the same area next weekend. More pipe, as long as I get some..
« Last Edit: April 15, 2023, 09:01:38 PM by Mike Fox »
Mike
Doing way too much to list...

Bill Reidy

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,475
  • Life member. Ack.
    • View Profile
Re: April 2023 Work reports
« Reply #19 on: April 15, 2023, 09:03:43 PM »
It was nice and smooth when I pulled in a little after 3 with the Odyssey.
What–me worry?

Stephen Lennox

  • Museum Member
  • Fireman
  • ****
  • Posts: 431
    • View Profile
Re: April 2023 Work reports
« Reply #20 on: April 16, 2023, 04:28:19 PM »
Anticipated work for Tuesday and Wednesday 19-20 April 2023

*  Coach #9 build
*  Vacuum brakes
*  Passenger car truck rebuild
*  Engine House
*  Track work 

John Kokas

  • Museum Member
  • Supervisor
  • ******
  • Posts: 1,770
    • View Profile
Re: April 2023 Work reports
« Reply #21 on: April 16, 2023, 07:56:23 PM »
Steve,  did you get all the info I sent you for the special project?
Moxie Bootlegger

Stephen Lennox

  • Museum Member
  • Fireman
  • ****
  • Posts: 431
    • View Profile
Re: April 2023 Work reports
« Reply #22 on: April 17, 2023, 07:19:42 AM »
Yes I did, thank you John.

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,356
  • Loco for 6
    • View Profile
Re: April 2023 Work reports
« Reply #23 on: April 19, 2023, 05:43:08 AM »
Anticipated work for Saturday April 22:

* Engine house construction
* Boxcar 56
* Digging?  Not sure if Mike has any digging planned
* Prep for SWW, which is the next weekend.

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,758
    • View Profile
Re: April 2023 Work reports
« Reply #24 on: April 19, 2023, 08:59:57 AM »
Digging planned between the ramp and the road. Pucking up the curbing and gravel to build the area up slightly. Please do not park there.
Mike
Doing way too much to list...

Stephen Lennox

  • Museum Member
  • Fireman
  • ****
  • Posts: 431
    • View Profile
Re: April 2023 Work reports
« Reply #25 on: April 19, 2023, 04:45:36 PM »
Work completed Tuesday and Wednesday 18-19 April 2023

Tuesday:
*  Passenger car truck work continues  (Jerry, Carlos)
*  Coach #9 build on going  (Eric, Ron)
*  New Container delivery  (Brendan)
*  Track crew replaces 15 ties, 7 joint bolts, 1 joint lift
    (Steve Lx, Steve Lt, Brian W, Paul R, Elijah, Leon, Jarred, Ty, Dan)
*  Keeping everyone on their toes  (Fred)

Wednesday:
*  Track Crew saws up and stacks 42 ties for SWW  (Steve Lx, Leon, Jared)
*  Coach #9 assembly continues  (Eric, Ron, Seth)
*  General clean up  (Fred, Brendan)
*  Vacuum brake work  (Jonathan, Jason) Work on Monday (Jonathan)

Note:  Southern Maine Model Railroad Club Show, Saturday in Westbrook Civic Center)

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,356
  • Loco for 6
    • View Profile
Re: April 2023 Work reports
« Reply #26 on: April 22, 2023, 04:46:07 PM »
Work done on Saturday April 22:

* Train show in Westbrook, Marcel was supposed to be manning it (I didn't go, so can't tell you if he was there or not).
* Engine house: Stewart, Zack, and Fred were busy.  I know that Fred was rebundling shingles.  Not sure what the others were doing.
* Dirt: In honor of Earth Day, Mike was moving a lot of it around.  He dug out a ditch to extend the culverts to the road ditch, put them in and filled it in.  We then placed the parking curbs.

Other people were doing other stuff, but I don't know what exactly.

Ed Lecuyer

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,588
    • View Profile
    • wwfry.org
Re: April 2023 Work reports
« Reply #27 on: April 22, 2023, 05:50:00 PM »
Marcel (and a bunch of other WW&F folks) did stop in at the Westbrook train show, but we did not have a formal table. The WW&F will be exhibiting at the Topsham train show NEXT Saturday (4/29) with Marcel and Jay Wiley manning that table.

Other work done included:
* A small grant application for a platform extension at Trout Brook (Ed, Brendan)
* Linda was busy receiving a ton of new materials for the archives. At this point, her current archive room is stuffed full - the new archive room can not come soon enough!
Ed Lecuyer
Moderator, WW&F Forum

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,758
    • View Profile
Re: April 2023 Work reports
« Reply #28 on: April 22, 2023, 06:39:23 PM »
My only photo of the day..



Why the drainage? Several years ago I had tried to figure what it would take to divert the water that was flowing by the turntable and through the yard. The problem increased with the creation of the parkinglot. We have now almost completely caught the water that flows from the parking area. The first catch basin made a big improvement. The last 2 and the pipe to the ditch will also help.
Mike
Doing way too much to list...

Bill Reidy

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,475
  • Life member. Ack.
    • View Profile
Re: April 2023 Work reports
« Reply #29 on: April 22, 2023, 07:22:39 PM »
Well, I took a few photos, as Mike and James worked...

Mike starting the trench from the catch basin he installed a week toward the ditch by Cross Road, as James looks on.


With the trench dug about halfway from the catch basin, Mike trenched back from the street ditch.




With the culvert sections in place, Mike backfilling around 2 p.m.


I can see in Mike's photo a lot more work was done after I left at about 2.30 p.m.