Work completed Tuesday and Wednesday 17-18 January 2023
Tuesday:
* Engine House work, shingling continues. (Stewart, Fred)
* Coach #9 work continues, the new castings get unloaded. (Eric, Ron)
* Passenger car trucks rebuild continues with forging of hangers being made. (Jerry. Carlos)
* Archive work continues (Linda)
* Freight Station work continues with pile driving, cribbing and removal of the platform frame
(Brendan, Chesterfield Associates Crew, Steve Lx, Brian W, Steve Lt, Mike Fox, Randy, Dan)
* Gift shop/mail on going. (Cindy R)
Wednesday:
* Engine House shingling (Stewart, Fred)
* Coach #9 work continues (Eric,Ron)
* Archives (Linda)
* Gift shop/Mail (Cindy R)
* Vacuum brakes testing/build (Jonathan)
* Big Joe tamper repairs (Brian W)
* Harsco tamper switched over to the Woods Track. (Steve Lx, Brian W)
* Freight Station work, pile driving continues. (Brendan, Chesterfield Associates crew)
NOTES: Big Joe is out of service, do not start the gasoline motor.