Work completed Tuesday and Wednesday 6-7 December 2022
Tuesday:
* Track crew completes the service/pit track, Track inspection, trees removed, winter prep.
(Steve Lx, Brian W, Steve Lt, Scott, Dan, Randy)
* Engine House Build continues with shingling on the north side, trim boards and painting
(Fred, Stewart R, Leon, Zack)
* Passenger truck rebuild continues. (Jerry, Carlos)
* Coach #9 assembly/build (Ron)
* Gift shop/mail on going daily. (Cindy R)
* Archives work (Linda)
* Rolling stock grease/oiling (Phil B)
* Vacuum brakes- new brake beam being built (Randy)
Wednesday:
* Vacuum brake work, brake beam clips.hangers being made (Jonathan, Randy)
* Coach #9 assembly continues (Ron and a new volunteer-sorry I don’t have a name)
Note:
* Heavy rains today canceling outside work
* Saturday Holiday Trains…..Beat the rush and sign up for crew and support positions.