Since I am on vacation for a couple weeks, I can venture to the museum when I feel like pretty much. Today was that day.
Rocks are being stockpiled to use along the main line between the station and pump house. The bank keeps slumping causing the track to lean.

Keeping with the station area improvements, I found erosion control installed ready for the work to begin. It is a windrow of mulch.

Looking around, I found a couple of trees at Sheepscot that had fallen recently. Mike R. Elijah R. and myself have since cleaned these up.


Fred was shingling here on the North side, but I did not get a picture of him.

Stewart was working here on the East side this afternoon but left before I could get a picture of him either

Jerry and Carlos were hard at it on the trucks.



The truck will get vacuum brakes before they leave. This Vacuum pot is just resting there, actual mounting will begin soon.

Jason, Mike R., Elijah R. and myself fixed the Car Barn bay 2 doors. The board that was installed to keep the doors closed was insufficient in the powerfull winds and the doors were blowing in the wind. The hinges got bent. We straightened them and installed bolts to stiffen the hinges more. The doors shut better when we finished.
I myself besides the trees installed the vents on the new fuel tank, figured out what modifications needed to be done to the sprokets on the dozer and removed them, then tore into the Kubota to see what was bothering the controls. I removed the floor and I found it. Dirt, now frozen.. I started chipping it out.

Eric and Ron were also in working on Coach 9. See that thread for pictures of the car and them working.