Work completed on Tuesday and Wednesday 22-23 November 2022
Tuesday:
* Train ops: Prep for Saturdays Holiday trains: Switching, test and set up.
Loco #9 (Dan, Roger, Bill R, Brian)
Loco #52 (Steve Lx, Steve Lt, Brian)
Yard switches lubricated, ground support (Paul R, Elijah, Leon, Jay Barta, Randy)
* Gift shop prep. (Cindy, Stewart, Paul R)
* Coach 16 set up for transport (Dan, Steve Lx, Steve Lt, Brian)
* Passenger truck rebuild continued with work on bearings. (Carlos, Jerry, Joseph G)
* Coach #9 assembly/build continues ((Eric, Ron)
* Engine house build continues (Fred, Stewart, Zack)
* Cemetery construction (Randy, Brendan, Jeff Varney)
* Archive work continues (Linda)
* Rolling stock grease/oil (Phil B)
Wednesday:
I was not at the Railroad but I assumwork continued with:
Engine house build
Gift shop Prep
Saturday train op prep
Notes: HAPPY THANKSGIVING TO YOU AND YOUR FAMILIES.