Work completed Tuesday and Wednesday 25-26 October 2022.
Tuesday:
* Track crew installs pit rail supports, drilling, cleaning, epoxied and bolts, 90 holes/bolts.
Two rails were moved for the project, replaced and final 2 rails placed on supports.
(Steve Lx, Brian W, Steve Lt, Paul R, Randy, Brendan, Jason)
* Coach #9 assembly continued (Eric, Roger, Harold)
* Passenger car truck rebuild continued (Jerry, Carlos)
* Trout Brook Station interior painting which looks complete (Fred, Andrew Zimmerman family)
* Gift shop/mail on going (Cindy R)
* Rolling stock grease/oiling (Phil B)
Wednesday:
* Train operations, Crew moves Locomotive #21 from MM&LW to SS loading ramp. (Jason, Dan)
* TOM fence, the last 2 fence post installed. (Steve Lt)
* TB bridge track inspection work (Steve Lx, Steve Lt)
* Engine house clean up. (Randy, Steve Lt, Steve Lx, Jonathan)
* Vacuum brakes work (Jonathan, Randy)
Notes: Heavy rains Wednesday.
October 29 starts Deer season in Maine, wear orange and be safe.
Happy Halloween