Work completed Tuesday and Wednesday replaces 10 ties 23-24 August 2022
Tuesday:
* Track crew replaces 10 critical ties, makes several lifts and leveling track areas, replaces four bolts,
tightens 9 joint bars Sutter crossing cleaned out (Steve Lx, Steve Lt, Brian W, Dan Joseph)
* Shop crew passenger truck rebuild continues (Jerry, Carlos)
Vacuum brakes testing continues (Randy)
* Coach #9 assembly/build continues (Ron, Lou)
* Locomotive #11 work session (Rick, Gordon C, Harold)
* Various work around Sheepscot campus (Stewart, Brendan)
* Compressor repaired for #11 crew (Jay Barta, Brendan)
* Small motor repairs, chain saws, compressor, flat car bench repaired (Jay Barta)
* Gift shop/mail on going (Cindy R)
Wednesday:
* Track crew switches out rolling stock, box car to TBS, Tankn car to AC, replaces 12 critical ties.
(Steve Lx, Steve Lt, Brian W, Paul, Elijah, Mark)
* Locomotive #11 work session continues (Rick, Gordon C, Harold)
* TBS station build (Fred, Brendan, Stewart)
* Small engine repair and clean up (Jay Barta)
* AC mowing (Randy)
Note: as always I have probably missed someone plus there is always work going at home off site.