Work completed Tuesday and Wednesday 5-6 July 2022
Tuesday:
* Track crew preps and installs the TBS tail track.
(Steve Lx, Steve Lt, Brian W, James P, Randy, Johnathan, Jason)
* Coach #9 assembly/build continues (Eric, Ron, Harold, Lou)
* Vehicle/small engine repair various machines (Jay B)
* Passenger car truck rebuild continues (Carlos, Jerry)
* Main line communication wire repairs (John M, Joseph G)
* General clean up/maintenance in SS (Stewart R)
* Rolling stock greasing/oiling (Phil B)
* Rail car repairs continue (Paul)
* Marketing/Admin (Steve P)
* Weed whacking TBS (Randy)
Wednesday:
* Track crew: ballast”s TBS and Mountain Ext. areas (Steve Lx, Steve Lt, Paul R, Elijah, James P))
Spiking begins on the TBS tail track (Dan, Nick)
* Coach #9 assembly/build continues (Eric, Ron)
* Locomotive work session (Gordan C, Harold, Jason)
* Weed Whacking TBS continues (Randy)
* SS clean up, trash run (Stewart R)
Notes: There is always something going around the railroad all week.
Fred has been in and out insuring we are on the job and checking on mowing needs.
Zack and Sonja stops by TBS to check on the station building.
Brendan has been in and out and loaded ballast 2 flats for the track crew.
Roger was in doing a variety of work.
Dave B checked in on TBS work.