Work completed Tuesday and Wednesday 21-22 June 2022
Tuesday:
* Track crew prep for Saturday Tie and Dine, cutting ties, loading and placement on main line.
(Dan, Steve Lt, Brian W, Paul, Elija, John)
* Passenger car truck work continues (Carlos, Jerry)
* Vacuum brakes design/build/test (Jonathan)
* Engine house build continues (Brendan, Stewart, Fred, Randy)
* Switching, TBS flat car unloaded and recovered and staged at AC ready for ballast, Big Joe moved
to AC. (Dan, Steve Lt, Paul Elija)
* Equipment repair (Jay Barta, Brian W)
Wednesday:
* Prep continued for Tie and Dine (Dan, Steve Lt)
* Mowing SS, (Randy, Jonathan)
* Engine house build continues (Brendan, Stewart, Fred, Steve Lt)
* Vehicle repair to Model T rail car continues
* Media event, more info expected from Jason
Notes: I was not at the railroad this week, I’m sure more was done or more volunteers were present, continual work on a weekly basis includes, SS clean up and trash run, Gift shop and mail handles by Cindy R, Archives by Linda, Rolling stock oiling by Phil B.