Work completed Tuesday and Wednesday 3-4 May 2022
Tuesday:
Shop Crew: Passenger truck build continued with more frame assembly (Carlos, Jerry, Jason)
A crew went to Mass. To pick up a new shop machine, no… I don’t know what it is.
(Jonathan, Brendan)
Campus: Cutting and stacking fire wood (Fred, Paul, Leon)
Trash pick up, building carpentry work, (Stewart)
Gift shop/mail (Cindy R)
Track crew: Various crew prep. Projects, TBS run around prep for spiking and ballast.
(Steve Lx, Steve Lt, Leon, Paul, Scott, Randy)
Coach #9 Coach assembly/build continues (Eric)
Oil/lubrication: Rolling stock journals oiled and lubricated (Phil B)
Admin/Meetings: (Dave B, Jason)
Wednesday:
Track Crew: TBS main line prepped for spiking and ballast (Leon, Steve Lx, Steve Lt, Jay B, Randy)
Shop Crew: The machine gets unloaded (Jonathan, Brendan)
Vacuum brakes design/build and testing (Jonathan)
Archives: (Linda)
Gift shop/mail (Cindy R)
Coach #9 Assembly/build continues (Eric, Ron)
Note: TBS track work area is on the south end of the turn table. Rain on Wed. prevented some outside work.