The operative word in Ed’s message was easier… nothing we do is easy. The point Ed makes is that we considered a number of options- at least 5- including the derelict Edaville GE (presuming it were available), and concluded that the conversion of a GE 45 tonner made the most sense overall. I wouldn’t necessarily use the word “easiest” there because the deduction process also included such factors as acquisition cost, transportation, current condition, parts acquisition (think big things like prime movers, generators, and traction motors with gearbox), body work, end capability, etc. It all ends up being a series of trade offs for which subjective judgment calls had to be made, however what was most attractive about this unit was its completeness, it’s in working order, and it’s low acquisition cost (even with transportation).
The heavy steel work Mike refers to is real work, to be sure, but it’s typical work for any number of heavy fabrication shops anywhere in the country. At the moment we have a sincere interest in hiring out the heavy fab work on these trucks to a local Maine shop according to our specifications. Keeping the nature of the work to what is commonly commercially available was a key point of this plan.
Now that the loco is on site, we can verify and refine our conversion plan. I hope to get conversion specifics with visuals posted within a couple weeks so our members can see the plan. I know there’s a lot of rumblings about how big it is and seemingly impossible the conversion will be- however, like always, we are breaking it down into understandable and manageable chunks. Further- pending a final proposal to the board and subject to their approval- I hope the majority of this project is hired out, so as to keep the project out of the way of projects more core to our mission.
Thanks all,
Jason