Work completed Tuesday and Wednesday 19-20 April, 2022
Tuesday:
Track crew worked on survey and clean up of line shed, 40 ties cut/stacked for the tie and dine.
(Steve Lx, Steve Lt, Brian W)
Shop crew worked on vacuum brake design/build (Jonathan, Jason) passenger truck build continues with the first truck frame ready for welding
(Jerry, Carlos)
Coach #9 assembly and build continues (Eric, Ron)
Vehicle maintenance (Brendan)
Rolling stock oiling/lubricating (Phil B)
Wednesday:
Track crew unloaded flat w/ties at TBS, crane car and 2 flats recovered from TBS, TBS main line ties were lined for spiking. Old ties along ROW recovered. SS campus clean up.
(Dan, Steve Lx, Steve Lt, Brian Paulm Elijah, Leon, Jared, Dave F, Pete, Cody)
Wood cutting/stacked (Fred)
Shop crew continued vacuum brake work (Jonathan)
Vehicle maintenance, Engine house, dump run (Stewart)
Locomotive maintenance #7 (Roger, Jason)
Coach #9 assembly continued (Eric, Ron)
Gift shop/mail (Cindy R)
Archive work (Linda)
Dirt recovered from the town road work dumped and leveled in the upper parking lot. (Brendan)
Note: various members were in and out Bob H and Zack W.
I expect Brendan can speak more about the in coming fill.