Work completed Tuesday and Wednesday 12-13 April 2022.
Tuesday:
* Track crew worked in several areas, maintenance of Big Joe revealed several issues which are
currently being resolved and awaiting parts. (Brian W, Jason)
Wilma (tamper) tested on north yard lead, the new control box built by Jay B worked great and a
a function check was made with good results. (Joe Fox, Steve Lx, Steve Lt, Leon)
Wilma maintenance, oils changed, brakes adjusted (Brendan, Brian, Leon)
* Shop crew worked on vacuum brakes (Jonathan, Randy)
Passenger car truck build continued (Jerry, Carlos)
Locomotive repairs #7 (Jason, Roger)
* Coach #9 assembly continues (Eric, Roger)
* Archives (Linda)
* Gift shop/mail, on going daily (Cindy R)
* Campus clean up/ dump run (Stewart, Fred)
Wednesday:
* Track crew worked lining ties at TBS (Fred, Steve Lx, Steve LT, Dan, Scott, Dave Fletcher)
Maintenance continued on tampers and #52. (Brian, Leon, Brendan, Scott)
* Shop crew continued on vacuum brakes design/build. (Jonathan, Randy)
* Locomotive #7 test fire. (Roger, Jason)
* Rolling stock repair on coach #3, #8 brake shoes and window repair. (Eric)
* Main line inspection, SS to TOM, tie’s and joint bars checked. Steve Lt, Dan, Steve Lt, Dave F)