Work completed Tuesday and Wednesday 22-23 February 2022
Tuesday:
* Track crew, Main line inspected (tree removed), all yard switches oiled function check,
cars switched for Saturday operation. (Steve Lx, Steve Lt, Chuck, Paul, Elijah, Scott, Bryce)
* Shop Crews, Vacuum brakes design/build continues. (Jonathan, Randy)
Passenger truck rebuild continues. (Jerry, Carlos)
* Coach #9 assembly continues (Eric, Ron)
* Training, (Jason, Pete, Cody)
* Campus clean up (Stewart)
* Gift shop/mail (Cindy R)
Wednesday:
* Shop Crew, Vacuum brake work continues (Jonathan, Randy)
* Cemetery, (Randy)
* Engine House, (Brendan, Fred)