Author Topic: February 2022 Work Reports  (Read 12835 times)

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,767
    • View Profile
Re: February 2022 Work Reports
« Reply #45 on: February 19, 2022, 08:15:09 PM »
Fred helped me with those lines yesterday. Was just cleaning them up to take and get new ones made.

Taken last week of what I expected to cut today





Had the fires going for a while when I thought about taking pics today. Great crew helped too.





Oh the things I find while cutting..



CHOW!



And they ran some trains...





Smile



Got some roarin fires





Winding down at the end of the day.





Mike
Doing way too much to list...

John Scott

  • Museum Member
  • Brakeman
  • ***
  • Posts: 150
  • Life Member
    • View Profile
Re: February 2022 Work Reports
« Reply #46 on: February 19, 2022, 10:01:19 PM »
True Maine backwoodspeople!

Stephen Lennox

  • Museum Member
  • Fireman
  • ****
  • Posts: 431
    • View Profile
Re: February 2022 Work Reports
« Reply #47 on: February 20, 2022, 05:22:03 PM »
Anticipated work for Tuesday and Wednesday 22-23 February 2022

*  Track Crew, Main Line inspection, yard switch maintenance
*  Shop, Vacuum brakes design/build, passenger truck rebuild
*  Locomotive Maintenance #7 (drain boiler)
*  Coach #9 assembly

Notes:  This is an expected light week. 

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,366
  • Loco for 6
    • View Profile
Re: February 2022 Work Reports
« Reply #48 on: February 23, 2022, 06:50:26 AM »
Anticipated work for Saturday Feb 26:

* Plow train Saturday morning to clear off whatever accumulated from Friday's storm.  It's not supposed to be too much (famous last words).
* Train ops in the afternoon.
* Machine shop/Coach 9 work
* Bulldozer repairs
« Last Edit: February 23, 2022, 02:38:48 PM by James Patten »

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,767
    • View Profile
Re: February 2022 Work Reports
« Reply #49 on: February 23, 2022, 12:30:55 PM »
With the storm expected to start Thursday night and go through Friday night, I do not expect to be there Saturday.
Mike
Doing way too much to list...

Stephen Lennox

  • Museum Member
  • Fireman
  • ****
  • Posts: 431
    • View Profile
Re: February 2022 Work Reports
« Reply #50 on: February 24, 2022, 09:05:28 AM »
Work completed Tuesday and Wednesday 22-23 February 2022

Tuesday:
*  Track crew, Main line inspected (tree removed), all yard switches oiled function check,
    cars switched for Saturday operation.  (Steve Lx, Steve Lt, Chuck, Paul, Elijah, Scott, Bryce)
*  Shop Crews,  Vacuum brakes design/build continues.  (Jonathan, Randy)
    Passenger truck rebuild continues.  (Jerry, Carlos)
*  Coach #9 assembly continues  (Eric, Ron)
*  Training, (Jason, Pete, Cody)
*  Campus clean up  (Stewart)
*  Gift shop/mail (Cindy R)

Wednesday:
*  Shop Crew,  Vacuum brake work continues  (Jonathan, Randy)
*  Cemetery,  (Randy)
*  Engine House,  (Brendan, Fred)

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,366
  • Loco for 6
    • View Profile
Re: February 2022 Work Reports
« Reply #51 on: February 26, 2022, 05:29:16 PM »
Work done on Saturday Feb 26:

* Snow moving: Brendan was moving snow around with the loader.
* Line inspection: A group including Dan and Steve P traversed the line to clear crossings.
* Train rides - 2 trips