Work completed Tuesday, 23 November 2021.
* Shop work, Passenger car truck rebuild continued. (Carlos, Jerry)
* Locomotive #9, repairs to glass valve and fire box grate repairs. (Roger, Wes C, Jonathan, Jason)
* Engine house build continues. (Brendan, Fred, Brian W)
* Archives work on going. (Linda)
* Track work, Track crew: replaced 2 ties necessary for safe operations north of Janesway Crossing.
Located and moved snow plow and materials for winter ops prep.
Tested Harsco Tamper, it works with problems identified.
Main line frm water tank to SS station, jacked, lined and half tamped.
Third tie on main was discovered and replaced.
(Steve L, Steve Leet, Brian W, Paul, Scott, Leon, Jason)
Note: A busy day in cold windy weather. Happy Thanksgiving to everyone.