Work completed Tuesday and Wednesday 4-5 January 2022
Tuesday:
Track crew, switching out all the rolling stock clearing the loading ramp
unfreezing north yard switches. (Brian, Chuck, Paul, Steve L)
Shop crew, Passenger car rebuild continues (Carlos, Jerry)
Coach #9, assembly and build continues, roof work, prep for temp. trucks (Eric, Randy)
Yard work, various material relocated, track stanchions to engine house, temp truck the machine shop
(Chuck, Brian, Paul, Steve L)
Vehicle repair/maintenance, (Mike, Brendan, Fred)
Gift shop/mail (Cindy R) Archives (Linda)
Campus clean up and Trash run, (Stewart)
Rolling stock oiling (Phil)
Admin for steam and shop work (Jason, Gordon C)
Wednesday:
Track crew, track inspection, clean out and salting of crossings (Steve L, Brian, Fred)
Coach #9, Temporary trucks placed under coach/coach lowered onto trucks
(Eric, Randy, Steve L, Brian, Joe Fox)
Archives, work continues (Linda)
Campus salt and sanding (Brendan)
Admin for steam and shop work (Jason, Gordon C)