Anticipated work for Saturday Dec 18:

Current forecast indicates snow, so the outdoor projects are dependent on that.

* Engine house construction
* Coach 9 machine work
* Boxcar 56 assembly
* Dozer disassembly
* Christmas Trains to SeaLyon.

Stephen Lennox

  • Museum Member
  • Fireman
  • ****
  • Posts: 431
    • View Profile
Re: December 2021 Work Reports
« Reply #31 on: December 16, 2021, 08:11:37 AM »
Work completed Tuesday and Wednesday14-15 December 2021

Tuesday:

Engine house, work continues/on going  (Fred, Brendan, Stewart)
Shop work, vacuum breaks design/build continues (Jonathan)
                    Locomotive #9 Maintenance  (Roger, Wes C, Jason, Randy)
                    Passenger car truck rebuild continues (Jerry, Carlos)
Coach #9 assembly continues (Eric, Ron)
Track work, temporary repairs to water tank spout made (Steve L, Brian W, Steve Leet)
                     service track lead leveled hand tamped, run through lead lowered
                        (Brain W, Steve Leet, Leon, Steve L)
Archives, Gift Shop/Mail (Linda, Cindy R)

Wednesday:

Locomotive #9 Maintenance completed  (Jason, Johnathan)
Afternoon Charter Prep.  (Dan, Brian W, Steve L JB Smith)
Charter Crew (JB Smith, Jonathan, Steve L, Brian W, Dan)
                       ( Sorry I don’t who was running the gift shop)
Campus clean up/dump run (Stewart)

Stewart "Start" Rhine

  • Museum Member
  • Superintendent
  • ********
  • Posts: 3,030
    • View Profile
Re: December 2021 Work Reports
« Reply #32 on: December 16, 2021, 09:11:16 AM »
Cindy had the gift shop open Wednesday afternoon.  The charter group must have enjoyed their visit, five people bought memberships. 

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,357
  • Loco for 6
    • View Profile
Re: December 2021 Work Reports
« Reply #33 on: December 18, 2021, 05:46:28 PM »
Work done on Saturday Dec 18:

* Case dozer: Mike got the remaining track plates off, took off the right side track chain. and removed the right side sprocket.  He removed the cover to the right side spring, which was broken.  He tried to remove the rollers but couldn't get the bolt out.
* Boxcar 56: Marcel mostly finished the interior lower sheathing.

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,761
    • View Profile
Re: December 2021 Work Reports
« Reply #34 on: December 18, 2021, 06:08:34 PM »
Mike
Doing way too much to list...

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,761
    • View Profile
Re: December 2021 Work Reports
« Reply #35 on: December 18, 2021, 07:38:36 PM »
Forgot to mention...

The Chesterfield Dozer tracks were cleaned this morning, and a new canvas cover was installed on the loader. Please reinstall the cover after use to help keep the operators compartment clear of ice and snow.
Mike
Doing way too much to list...

Ed Lecuyer

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,589
    • View Profile
    • wwfry.org
Re: December 2021 Work Reports
« Reply #36 on: December 18, 2021, 08:20:51 PM »
We also ran Christmastime Trains to SeaLyon Farm. Lots of happy faces among passengers and crew.
Ed Lecuyer
Moderator, WW&F Forum

Stephen Lennox

  • Museum Member
  • Fireman
  • ****
  • Posts: 431
    • View Profile
Re: December 2021 Work Reports
« Reply #37 on: December 19, 2021, 07:22:03 PM »
Anticipated work for Tuesday 21 December 2021.

Shop work,  Vacuum brakes build and design 
                     Passenger car truck rebuild
Coach #9 assembly
Engine house build (pending)
Track work, clean out (pending)
Campus clean up

Stephen Lennox

  • Museum Member
  • Fireman
  • ****
  • Posts: 431
    • View Profile
Re: December 2021 Work Reports
« Reply #38 on: December 21, 2021, 05:48:15 PM »
Work completed Tuesday 21 December 2021.

*  Shop work, Vacuum brake work continues  (Johnathan, Randy)
                     Passenger car truck rebuild continues  (Carlos, Jerry)
*  Coach #9,  Assembly continues with more tin roofing applied  (Eric, Ron)
*  Locomotive #9 Maintenance continues, boiler drained  (Roger)
*  Track work,  Main Line/crossings inspected  ( Steve L, Brian, Steve Leet, Paul, Chuck)
                      Wheel/axles moved/stored         ( same crew )
                      Temp. passenger trucks staged   ( same crew)
*  Archives work continues  (Linda)
*  Fred stopped in to insure we were all working

Note:  Crews will be off tomorrow, Merry Christmas to all.

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,761
    • View Profile
Re: December 2021 Work Reports
« Reply #39 on: December 21, 2021, 08:36:00 PM »
Very busy day! Nice report as usual Steve.
Mike
Doing way too much to list...

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,357
  • Loco for 6
    • View Profile
Re: December 2021 Work Reports
« Reply #40 on: December 22, 2021, 06:54:41 AM »
Anticipated work for Saturday Dec 25:

* We don't expect anyone to show up on Christmas Day.  Instead, we hope that you're able to spend the day with loved ones.  However, if Santa puts coal in your stocking, we'll be happy to take it off your hands.

Graham Buxton

  • Museum Member
  • Fireman
  • ****
  • Posts: 477
    • View Profile
Re: December 2021 Work Reports
« Reply #41 on: December 22, 2021, 08:28:31 AM »
However, if Santa puts coal in your stocking, we'll be happy to take it off your hands.
:) Gosh, there is a heck of a fundraiser!

Make coal available in the WW&F Gift Shop.*  Then Santa(s) around the country would have a ready source of coal for those ... difficult ... ::) individuals.     Some of those coal recipients might even choose to donate that coal back to the WW&F ...  8)



* I recall the Niles Canyon Railway / PLA (Fremont CA) having a "Buy a Ton of Ballast" program. It  seems unlikely that the donor actually took delivery of that ballast.

 ;D
« Last Edit: December 22, 2021, 08:43:47 AM by Graham Buxton »
Graham

Benjamin Richards

  • Museum Member
  • Fireman
  • ****
  • Posts: 418
    • View Profile
Re: December 2021 Work Reports
« Reply #42 on: December 22, 2021, 04:06:58 PM »
* I recall the Niles Canyon Railway / PLA (Fremont CA) having a "Buy a Ton of Ballast" program.

Near my previous place of residence, the Belvidere & Delaware River Railway (the "Bel-Del") has had a Buy-A-Tie program at various points in the past several years.

Bill Baskerville

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,446
  • Life Member
    • View Profile
Re: December 2021 Work Reports
« Reply #43 on: December 24, 2021, 10:50:08 PM »
Any of you boys and girls who happened to get on Santa's naughty list this year, please save your coal and bring it to the Museum on your next visit.  Number 9 needs a full hopper for the new year. 

May the New Year bring peace and joy for all our volunteers, their families and the many friends of our railway.

Until then, Merry Christmas to all, and to all, a good night.
~ B2 ~ Wascally Wabbit & Gofer ~

Stephen Lennox

  • Museum Member
  • Fireman
  • ****
  • Posts: 431
    • View Profile
Re: December 2021 Work Reports
« Reply #44 on: December 26, 2021, 07:11:17 PM »
Anticipated work for Tuesday and Wednesday 28-29 December 2021.

*  Shop work:  Vacuum brakes design/build continues
                       Passenger car truck rebuild to continues
                       Engine house pit stanchions to be completed
                       Locomotive #11 prep work continues
*  Coach #9 assembly/build continues  (Pending)
*  Engine house build to continue  (Pending)


Notes:  Just a thought for all that idle time one might have while waiting for the new year. With the expectation of a safety topic for each month, we all just might look into the Regulation Book. For starters, a good topic would be Secure from Safety, Rules #70 and #71 is always a good place to start.