Work completed Tuesday and Wednesday14-15 December 2021
Tuesday:
Engine house, work continues/on going (Fred, Brendan, Stewart)
Shop work, vacuum breaks design/build continues (Jonathan)
Locomotive #9 Maintenance (Roger, Wes C, Jason, Randy)
Passenger car truck rebuild continues (Jerry, Carlos)
Coach #9 assembly continues (Eric, Ron)
Track work, temporary repairs to water tank spout made (Steve L, Brian W, Steve Leet)
service track lead leveled hand tamped, run through lead lowered
(Brain W, Steve Leet, Leon, Steve L)
Archives, Gift Shop/Mail (Linda, Cindy R)
Wednesday:
Locomotive #9 Maintenance completed (Jason, Johnathan)
Afternoon Charter Prep. (Dan, Brian W, Steve L JB Smith)
Charter Crew (JB Smith, Jonathan, Steve L, Brian W, Dan)
( Sorry I don’t who was running the gift shop)
Campus clean up/dump run (Stewart)