Work completed Tuesday and Wednesday 26-27 October 2021.
Tuesday:
* Track work, Service track and track switch was relined, a broken rail replaced and a short
section of rail added to smooth out the curve and rolling of the rail, good results.
(Jason, Steve L, Steve Leet, Randy, Phil B)
* Shop work, Passenger truck rebuild continues (Jerry, Carlos)
Bolster build (Zack)
Vacuum brake work/design (Jonathan)
* Engine House, Brendan
* Archives (Linda)
Gift shop/mail (Cindy R)
* Coach #9 build continues (Eric)
Wednesday:
* Shop work, Vacuum brake build (Jonathan, Dave P)
* Coach #9 build Roof work (Eric, Ken A)
* Yard switching (Jason, Steve L)
* Equipment shopping/tools/parts and pieces (Brendan)
* Campus clean up, dump run (Stewart)
Note: Track work and outside called off due to the storm.