Work completed Tuesday and Wednesday 16-17 November 2021.
Tuesday:
* Yard switching, moving all rolling stock from car barn. (Brendan, Bryce, Scott)
* Car Barn excavation starts, removal of clay and dirt from between the 3 tracks,
stone placed down readying for future concrete work. (Brendan, J. Verney Excavation)
* Track work, Sutters and Brook Crossing mud/debris clean out. (Steve L, Steve Leet, Paul, Brian W)
Yard clean up, (Paul, Brian W, Steve Leet, Steve L, Scott)
* Humason Trestle clean up completed (Steve L, Brian W, Steve Leet, Scott)
* Shop Work, passenger car rebuild continues (Jerry, Carlos)
vacuum brakes design/build (Jonathan, Jason)
* Engine house build continues (Fred, Stewart)
* Trout Brook EOT surveying. (Randy, Paul)
* Harsco Tamper repairs (Jay B)
* Coach #9 assembly continues on the roof (Eric)
* Gift shop and mail (Cindy R) Archives (Linda)
Wednesday:
* Campus clean up and dump run (Fred, Stewart)
* Car barn excavating (Brendan, Vernery Excavation, JB Smith, Jeff S)
* Main line walk inspection, 20 plus joint bolts tightened, 2 ties marked for immediate replacement
a variety of noted repairs for future maintenance. (Steve L, Steve Leet)
* Shop work, vacuum brakes build (Jonathan, Dave P)
* Track work, service track turn table lead prep for final install. (Jason, Randy, Jeff S)
* Coach #9 assembly continues-roof work. (Eric)
* Switching, rolling stock returned to car barn (Steve L, Jay B, Steve Leet, Jeff S)
* Archives (Linda)