Work completed Tuesday and Wednesday 5-6 October 2021
Tuesday:
* Track work, the run through and service tracks to the engine house center lines and tie placements
were marked out. (painted) (Steve L, Paul, Steve L, Chuck, Brian W)
Stub switch repair (Bill B, Jeff S)
Switch Stand repairs (Bill B)
* Shop work, Passenger car truck rebuild continues. (Jerry, Carlos)
Vacuum Brake work continues. (Johnathan, Randy)
* Coach #9, assembly/build continues. (Eric, Ron Harold, Lou).
* Rail Crane loaded on flat car #126 ( Brendan, Steve L, Steve Leet, Chuck, Brian W, Paul)
* Engine House (Fred, Stewart, Brendan)
* Switching crew (Bill B, Jeff S)
* Gift shop/ mail, Archives work (Cindy R, Linda)
Wednesday:
* Shop work, Vacuum brakes/various projects (Jonathan, Randy, Dave R, Jason, Harold, Gordan C)
* Engine House (Fred, Stewart)
* Campus clean up (Fred, Stewart)
* Tamper( Harsco) repairs continue. (Jay B)
* Coach #9 Assembly continues (Eric, Harold)
* Archives, Gift Shop/mail (Linda, Cindy R)
* Work Saturday preparation rail sorting begins) (Steve L, Chuck, Steve Leet, Dave F)
* Various projects around campus (Bill B, Jeff S, Bob Holms)
Note: Work session this Saturday. Pumpkin Trains!
As always, there were volunteers who I missed or did not know who they were.