Work completed Tuesday and Wednesday 19-20 October 2021
Tuesday:
* Track Work, Service Track switch to Car Barn Switch #1 curved lined up, frog and points set.
Steve L, Chuck, Steve Leet, Bryce, Jason, Randy, Leon, Scott)
* Shop work, passenger car truck rebuild continues (Jerry, Carlos)
vacuum brake work (Jonathan)
* Engine House build, (Brendan, Fred, Stewart)
* Tamper (Harsco) repairs, (Jay B)
* Morning Charter Run (JB)
* Gift Shop/mail (Cindy R) Archives (Linda)
* Lubricating Rolling stock (Phil B)
* Training, Brakeman (Joe and Jay Monty, Scott, Ken)
Engineer (Eric)
Wednesday:
* Track Work, Service Track switch points frog, slide plates bolted, spikes in.
Jason, Steve L, Steve Leet, Brian W, Bryce, Dan, David F, Chuck, Joe F)
* Shop work, Vacuum brakes (Jonathan, Dave P)
* Engine House, (Brendan, Stewart, Fred)
* Gift Shop/mail (Cindy R), Archives (Linda)
* Coach #9 assembly (Eric)
* Admin work (Randy)
* Parking Lot prep., (Morning- Bryce, Afternoon- Steve L, Brian, Steve L)