I don't know if anyone took pictures yesterday. There was about a half dozen of us from the WW&F, and another half dozen or so SR&RL volunteers. They had torn out a section and a half of track right compass west of the bridge, removed the ties, put in new longer ties, and replaced the rail. We had to adjust the height of the ballast and spike the track. They are rebuilding a siding that was there so that they can load/unload cars/engines for road transport. A group worked on getting the ramp built, while another group worked building the track from the frog across the bridge (as a gauntlet track); the "switch" will be done as a stub switch to be moved as needed when the road moves happen. Fred, JB and I came up together and left about 2:30, people were still going strong when we left.