Work completed Tuesday and Wednesday 7-8 September 2021
Tuesday:
* Track work, 3 troublesome joints at MP#7 lifted, ballasted and tamped, ML&MW switch
lifted ballasted and tamped, Big Joe returned to Sheepscot for service and minor repairs.
(Brian W, Chuck, Steve Leet, Scott Higgins, Steve L)
* Shop work, Passenger truck rebuild (Jerry, Carlos), Vacuum brakes build (Johnathan, randy)
Engine House pit support manufacture (Bryce)
* Mowing Alna Center (Fred, Randy)
* Trout Brook Bridge Kiosk build (Randy)
* Tamper (Wilma) repairs continue, (Jay B)
* Coach #9 assembly continues (Eric)
* Campus clean up (Stewart, Fred)
* Gift Shop (Cindy R)
* Rolling stock Truck Journal greasing/oiling (Phil B)
* Trout Brook turn table work (Brendan, Jason, Fred)
Wednesday:
* Track, 3 turn table cribs build, (Steve L, Steve Leet, Chuck)
* Shop, Support manufacture (Bryce)
Vacuum brake build ( Johnathan, Randy)
* Coach #9 build continues (Eric)
* Gift Shop/Kitchen supplies (Cindy R)
* Mowing Sheepscot campus (Fred)
* Campus clean up (Stewart)
* Trout Brook turn table construction (Brendan, Jason)
Note: A lot of work has been going on at the Railroad beyond Tues-Wed..
Clean up on Monday (Stewart, Ed)