Work completed Tuesday and Wednesday 17-18 August 2021.
Tuesday:
* Track work, MP#7 heading south, 8 more joints ballasted, lifted and tamped., select brush cut.
(Steve L, Brian W, Chuck B, Steve Leet, Bill Reidy)
* Brookville repairs (Jay B)
* Shop, wheel pressing (Jerry, Carlos, Stewart)
* Campus maintenance and clean up. (Fred, Randy)
* New Machine Shop Storage building, shelving build begins.
(Brendan, Randy, Jason)
* Gift shop, kitchen supplies (Cindy R)
Wednesday:
* Track work, MP#7 heading south, 5 more joints ballasted, lifted and tamped. MLMW switch received ballast
in preparation to lift the lower east side of the track.
(Steve L, Steve Leet, Chuck B, Brian W, Paul and Elijah, Dan, Nick, William)
* New Machine Shop Storage Building shelving continues. (Brendan, Randy, Chuck, Jason).
* Brookville work (Jay B)
* Campus maintenance and clean up (Fred, Stewart)
* Switching, Caboose #554 staged at Alna Ctr, Open Coach #130 on Car Barn lead #1, Flat cars
#118 and #126 on Woods Track, Engine #52 on Machine shop lead #1.
(Chuck B, Brian W, Dan, Steve L)