Where Steve Lennox says "Yard Switching" for work to do today... I have to say as a complete novice, that I was impressed by the logic-puzzle game of shuffle that went on to move B&SR #8 up to ML&M.
Kudos to Dan, Bryce, Jeff, and Jason for pulling off a remarkable feat! - and for allowing Cody and me to ride along.
The process went something like this (It really needs a diagram):
1) Clean up and lubricate #8, move handcar, crane, and trucks out of the way.
2) Couple #52 to Flatcar #118 and #118 to Loco #8
3) Drop #8 on the mainline at ML&M
4) Couple #118 to two B&SR boxcars at ML&M, pull them off the siding, split them apart, push the unnumbered one back onto siding,
5) Couple B&SR #51 to Loco #8 (after Jason brings a spare coupler pin), push #8 onto siding
5a) Not sure which was heavier - the deer flies or the rain
6) Head to TOM pulling #118 and #51, runaround with #52
7) Stop off at Alna Center to pet Steve P's goats
8) Return to Sheepscot
Here Dan removes a trig.