Author Topic: June 2021 Work reports  (Read 16536 times)

Stephen Lennox

  • Museum Member
  • Fireman
  • ****
  • Posts: 429
    • View Profile
Re: June 2021 Work reports
« Reply #15 on: June 03, 2021, 06:48:06 PM »
Thank you Bob.

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,563
    • View Profile
Re: June 2021 Work reports
« Reply #16 on: June 03, 2021, 08:48:20 PM »
I think Wilmar will be 1016. The last 2 cars that were built and numbered were the work flat 1014 and the equipment car 1015. If I remember, I will bring the stencils..
Mike
Doing way too much to list...

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,138
  • Loco for 6
    • View Profile
Re: June 2021 Work reports
« Reply #17 on: June 04, 2021, 05:48:43 AM »
1016 is the tie changer (it's got 4 wheels), 1017 is the tamper.

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,138
  • Loco for 6
    • View Profile
Re: June 2021 Work reports
« Reply #18 on: June 05, 2021, 05:03:51 PM »
Work done on Saturday June 5:

* Level the Mountain: Jacking and tamping occurred, making good progress.  The track went up several inches in places, making ballast hard to find in that immediate location.  Of course there's lots of other ballast in other places where we don't need it!
* Alna Center: A bunch of gravel was delivered, and Mike took the loader up to cart it around and put it under the pavilion.  Mike was also getting loam from a dirt pile north of the field and spreading it around the pavilion.
* Visitors: A few random visitors throughout the day, including relatives of Alice Ramsdell who came to see #9.

Richard "Steam" Symmes

  • Museum Member
  • Fireman
  • ****
  • Posts: 445
    • View Profile
Re: June 2021 Work reports
« Reply #19 on: June 05, 2021, 08:50:59 PM »
Isn't Alice's nephew, a Mr. King, the man who leased the #9 to the WW&F, along with a boxcar?  I met Alice once years ago down at the Walker Transportation Collection at Beverly Historical Society. Every Wednesday evening was an open house / work session at the collection. There was an elderly deaf lady who used to visit once in a while. One night she came creaking down the stairs to our basement headquarters, and behind her was another old lady whom we'd never seen.  The first lady introduced her to us. . . "This is Alice Ramsdell". Well we were dumbstruck! The fabled owner of the WW&F locomotive down in Putnam, CT herself!  They stayed an hour or so and we dragged out lots of photos of the loco as SRR #5, SR&RL #6, KC #4.  She had a great time looking at them. It was the only time I ever saw her. I'll never forget it.
 Richard Symmes

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,138
  • Loco for 6
    • View Profile
Re: June 2021 Work reports
« Reply #20 on: June 06, 2021, 02:32:38 PM »
Yes, Mr. King is the owner of #9 and boxcar 309.

Stephen Lennox

  • Museum Member
  • Fireman
  • ****
  • Posts: 429
    • View Profile
Re: June 2021 Work reports
« Reply #21 on: June 07, 2021, 08:19:14 AM »
Anticipated work for Tuesday and Wednesday June 8-9, 2021.

*  Track work, set up for the 2d section of Saw Mill curve  (Tue.) Tamp (Wed.)
*  Shop work, wheel pressing  (Pending)
*  Tool shed shingle work
*  Small vehicle repairs  (Brookville-pending)
*  Sheepscot, Campus work and maintenance
*  Vacuum brakes  (pending)

Note:  Weather conditions for both days will high temps (80+).
           Track/workers bring a lunch



                   Rules and Standards for Operations   Out of Service Track   

XV  Out of Service Track  (Rules 118-124)

118.  Out of Service Track  (page 33)Timetable Track Conditions
     
         Out of service track is any track not recognized as in service by the Timetable
         or Formal Notice, or any track authorized to be Out of Service per Rule 121
         and delineated by Fixed Red and Yellow track flags per Rule 122.

Example:  Notice Board Bulletin Order date 04/14/2021, Section titled
                  “Timetable Track Condition Changes”

James Patten

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,138
  • Loco for 6
    • View Profile
Re: June 2021 Work reports
« Reply #22 on: June 09, 2021, 05:53:51 AM »
Anticipated work for Saturday June 12:

* Midcoast Conservancy Trail Day.  Not sure what's involved in this one!
* Earth moving, at AC and SS
* SS section house shingling
* Machine shop
* Board meeting at 4

Ed Lecuyer

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,114
    • View Profile
    • wwfry.org
Re: June 2021 Work reports
« Reply #23 on: June 09, 2021, 07:55:23 AM »
Midcoast Conservancy Trail Day.

This is the project to relocate the "blue trail" at Trout Brook Preserve off of the WW&F RoW so that train service can safely begin at the new station site.

This is a critically important project to the long-term goals of the museum. All help will be greatly appreciated.
Please sign up at:
https://fareharbor.com/embeds/book/wwfry/items/308456/?full-items=yes&flow=420374
Ed Lecuyer
Moderator, WW&F Forum

Mike Fox

  • Museum Member
  • Empire Builder
  • ********
  • Posts: 5,563
    • View Profile
Re: June 2021 Work reports
« Reply #24 on: June 09, 2021, 08:10:21 AM »
I will be late arriving Saturday so not sure what I'll do at AC.

Also, I wish I could make the trail relocation. I had walked and found an excellent spot that would require very little to put the trail through. Limbing and cut a couple of logs on old trees that had fallen over the years. But maybe you can find a better spot.
Mike
Doing way too much to list...

Ed Lecuyer

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,114
    • View Profile
    • wwfry.org
Re: June 2021 Work reports
« Reply #25 on: June 09, 2021, 08:49:18 AM »
There are various proposed locations for the trail relocation. We are meeting with Midcoast this afternoon to finalize the plan. The most important aspects are where the trail crosses the railroad and distance from the railroad when the trail runs parallel.
Ed Lecuyer
Moderator, WW&F Forum

Bob Holmes

  • Museum Member
  • Engineer
  • ****
  • Posts: 748
    • View Profile
Re: June 2021 Work reports
« Reply #26 on: June 09, 2021, 06:07:31 PM »
This has always been a potential sticking point since we started the extension.  They have been using our ROW down there for a long time, but we own it!  So let's hope we can find a mutually satisfactory resolution that protects both us and them...both programmatically and legally.

Bob

Bill Reidy

  • Museum Member
  • Inspector
  • ******
  • Posts: 1,358
  • Life member. Ack.
    • View Profile
Re: June 2021 Work reports
« Reply #27 on: June 09, 2021, 06:37:41 PM »
Midcoast Conservancy Trail Day.

This is the project to relocate the "blue trail" at Trout Brook Preserve off of the WW&F RoW so that train service can safely begin at the new station site.

This is a critically important project to the long-term goals of the museum. All help will be greatly appreciated.
Please sign up at:
https://fareharbor.com/embeds/book/wwfry/items/308456/?full-items=yes&flow=420374

I have to work Saturday; otherwise, I'd join the work.  Like our Museum, Midcoast Conservancy has done much work to preserve the cultural and natural heritage of the Sheepscot Valley.  I'm glad we can and do partner with the conservancy, SeaLyon Farm and other local businesses and organizations.
What–me worry?

Ed Lecuyer

  • Administrator
  • Superintendent
  • *****
  • Posts: 4,114
    • View Profile
    • wwfry.org
Re: June 2021 Work reports
« Reply #28 on: June 09, 2021, 06:41:52 PM »
Quote
let's hope we can find a mutually satisfactory resolution

That is indeed the goal and Midcoast Conservancy has been fabulous to partner with. The solution that is being implemented is more than satisfactory to everyone involved.

Work will begin on Saturday on a new "upper" connecting trail which will allow visitors to the Preserve to only cross the tracks in one location (near the bridge) while maintaining convenient access the entire trail system. If there is time, the new lower trail from the parking lot to the pedestrian crossing will be roughed in.

Once completed, there will be no need for visitors to Trout Brook Preserve to walk on or alongside the active railroad.
Ed Lecuyer
Moderator, WW&F Forum

Stephen Lennox

  • Museum Member
  • Fireman
  • ****
  • Posts: 429
    • View Profile
Re: June 2021 Work reports
« Reply #29 on: June 10, 2021, 08:13:31 AM »
Work completed Tuesday and Wednesday June 8-9, 2021.

Tuesday:

*  Track work, the second section of Saw Mill Curve was lifted and readied for tamping.
    (Steve L, Dan, Brian W, Chuck, Jason).
*  Shop work, Wheel Pressing  (Jerry and Carlos)
*  Tool Shed shingling  (Stewart)
*  Small vehicle repair,   Brookville  (Jay B)  Fred’s Tractor  (Brendan)
*  Moving and campus clean up (Fred, Randy)

Wednesday:

*  Track work, cross leveling and tamping Saw Mill curve. (Steve L, Brian W, Leon, Randy, Chuck)
*  Shop work, #10 and #11 parts relocated in prep for Bay #1 over head crane install (Jason, Gordon C)
*  Mowing Alna Center (Fred, Randy)
*  Tool Shed shingling (Stewart)
*  Brookville work continues (Jay B)

There several other things going I may have missed.