Work completed Tuesday and Wednesday June 1-2, 2021
Tuesday:
* Track work, car barn leads were ballasted and put back in service, tamping to
be completed at a later date. Turn table lead received additional ballast.
( Steve L, Chuck, Brian W, Jonathan, Jay B, Leon)
* Shop work, Wheel pressing. (Jerry, Carlos, Alan)
* Tool shed shingling. (Stewart)
* Mowing Alna Center, SS Campus (Fred, Randy)
* Vehicle repair (Brookville) (Jay B)
* Round/Engine house foundation poured
Wednesday:
* Track, preparation for Saturdays Level the Mountain included cleaning out ballast,
setting up jacks, leveling and cross leveling Saw Mill Curve. (Steve L, Dan, Leon, Jared, Jason)
* Tamper (Big Joe) repairs (Jay B)
* Switching, Tamper (Wilmah 1017 ?) to Machine shop lead 4, Caboose #320 inside Car barn
Bay #2, Tamper (Big Joe on Machine shop Lead #1. (Dan, Steve L, Chuck)
* Gift shop (Cindy R)
* Archives (Linda)
* Coach #9, assembly continues.
Note: There were more things going both days, I apologize for missing them.